Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />o <br /> <br />Identify remedial measures to stabilize the slopes. <br /> <br />I <br /> <br />o <br /> <br />Define a construction program. <br /> <br />o <br /> <br />Estimate projects costs. <br /> <br />I <br /> <br />I <br /> <br />To achieve the Phase II Report objectives the following work items <br /> <br />were completed. <br /> <br />I <br /> <br />o <br /> <br />A program of drilling, field testing and geotechnical labora- <br />tory index and strength testing. <br /> <br />I <br /> <br />o <br /> <br />New aerial photo mapping of the project area. <br /> <br />I <br /> <br />o <br /> <br />Detailed slope stability analysis of existing conditions and <br />the corresponding slope stability of the project area as a <br />result of proposed construction activity. <br /> <br />I <br /> <br />o <br /> <br />A cost estimate for the proposed construction activities. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1-3 <br /> <br />I <br /> <br />I <br />