My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00047
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153490
Contractor Name
Union Avenue Boat Chute 1987
Contract Type
Miscellaneous
Water District
0
County
Arapahoe
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />OBJECTIVES <br /> <br />1-8 <br /> <br />o Provide boat docks at both ends of the chute which facilitate easy <br />put in and take out for all types of paddle craft. <br /> <br />ENJOYMENT AND BOATER INTEREST <br />The objective is to create a facility that, through its design, is safe yet <br />enjoyable to its users. The design is to incorporate challenging boating <br />conditions for the boater with basic skills that will provide interest and <br />enjoyment in its use. A properly designed chute will attract a wide range <br />of users from recreational enthusiasts to competitive kayak racers. <br /> <br />A substantial investment will be made in the by-pass. It should benefit as <br />Large a segment of the public as practical. <br /> <br />o Design the boat chute to offer "action" but navigable by a novice <br />in a canoe or kayak through a wide range of flows. <br /> <br />o Consider the installation of removable obstructions for training <br />and advanced competition. <br /> <br />o Design for easy recovery in the event of boaters dumping in the <br />chute. <br /> <br />FISH HABITAT IMPROVEMENT <br />The objective is to create an environment which enhances the fish habitat <br />as well as the boating potential. The criteria to achieve this are as <br />follows: <br /> <br />o A maximum single drop of approximately two feet which . will enable <br />the fish and aquatic life to migrate upstream through the chute. <br /> <br />o Create pools approximately four feet deep to provide for fish <br />cover during periods of low flow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.