Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Appendix B: Study Scope of Services <br /> <br />Construct and core an HQ diameter well on tl1e Elbert County Fairgrounds in the manner <br />specified in the Invitation to Bid document in Appendix A. Sample water from two levels <br />(the Laramie Fox Hills and Arapahoe aquifers) using packers. <br /> <br />Budget (CWCB-DWR contribution. Grant Contract CI53844) <br /> <br />Well Construction <br />Water samoling <br />Subtotal <br /> <br />$81,000 <br />$7.000 <br />$88,000 <br /> <br />NOTE: The total cost for well construction is $110,250. Additional funds are supplied by <br />the National Science Foundation and the Denver Museum of Natural History. <br /> <br />Hydrogeological analyses of the Elbert County Reference Core by Dr. William E. <br />Sanford, Department of Earth Resources, Colorado State University in coordination with <br />the overall hydrological research program on the core overseen by Dr. Stan Robson, <br />USGS Division of Water Resources (see separate contract between the USGS and <br />CWCB). Dr. Sanford will perform analyses 0[1 at least 50 samples from the core of <br />vertical hydraulic conductivity, horizontal hydraulic conductivity, porosity, and specific <br />yield. . <br /> <br />Budget (CWCB-DWR contribution. Grant Contract C153844) <br /> <br />Graduate student stipend 12 rnonths at $1000/month <br />Graduate student fringe benefits (4.1 %) <br />Two sernesters tuition <br />Misc. supplies <br />Travel <br />Subtotal <br /> <br />$12,000 <br />$492 <br />$2,632 <br />$4,076 <br />$800 <br />$20,000 <br /> <br />Total <br /> <br />$108,000 <br /> <br />NOTE: Colorado State University has agreed to contribute the in-kind salary rnatch of <br />$10,000 for Dr. Sanford's time and the.indirect cost amounting to $4,515. <br /> <br />Appendix B <br />