My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00030
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:30:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153325
Contractor Name
West Divide Water Conservancy District
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I <br />I <br />I <br />I <br />I <br />. <br />. <br />I <br />. <br />,. <br /> <br />Rifle Village South 1s presently the only approved subdivision in <br />the project area. The platted subdivision contains approximately <br />200 lots, most of which are between 6,500 and 10,000 square feet <br />in area. About 36 houses have been built in the subdivision to <br />date, and these have been erected on double lots. Residences in <br />this subdivision are presently served by the Rifle Village South <br />Metropolitan District which provides domestic water and sanitation <br />service to ~he subdivision by means of central systems, The sources <br />of water for the existing Metro water system are springs and wells, <br />The Metro District has its own wastewater treatment plant and <br />collection system. <br /> <br />The City of Rifle has been approached by the Metro District for a <br />supply of municipal water. These negotiations have been unsuccessful <br />so the Metro District has been seeking other sources. By letters of <br />September 15, 1978, and April 22, 1980, to the West Divide Water Con- <br />servancy District the Rifle Village South Metropolitan District re- <br />quested commencement of negotiations for a supply of municipal waters <br />from the West Divide Project. <br /> <br />The only other development in the project area for which plans have <br />been made public is the proposed Southside Center, The Southside <br />Center is a commercial Planned Unit Development (P. U. D.) to be <br />located in the southeast quadrant of the Interstate 70-Rifle inter- <br />change, It will be bounded on the north and west by the 1-70 right- <br />of-way and on the south by South Seventh Street (County Road No. 346). <br /> <br />As described in the P. U. D. application~ present plans for the <br />Southside Center include a 300 unit motel, a gasoline station, two <br /> <br />l! Southside Center, A Planned Unit Development; application to <br />Board of County Commissioners of Garfield County, Colorado; <br />May 14, 1980. <br /> <br />111-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.