My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00015
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:21 AM
Creation date
10/5/2006 11:29:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153631
Contractor Name
Beaver Reservoir Company
Contract Type
Loan
Water District
59
County
Gunnison
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,. <br />I <br /> <br />e <br /> <br />. <br /> <br />Woodward.Clyde <br />Consultants <br /> <br />JAMES M. JOHNSON <br /> <br />page 2 <br /> <br />Minnesota Dam. Minnesota Canal and ReseIVoir Company. Delta County. Colorado <br /> <br />Completed study to assess feasibility of developing 7S0-foot high embankment to store <br />irrigation water. Preliminary design includes zoned earth embankment, RCP outlet <br />conduit, and unlined emergency spillway. <br /> <br />Buckeye ReseIVoir Dam. Paradox VaHey Water ConselVancy District. Montrose County. <br />Colorado <br /> <br />Supervised all field and design work for remedial construction on SO-foot high, "puddle <br />core" earth embankment. Design included soil-bentonite slurry wall, crest raise, <br />emergency spillway, relined outlet conduit, new intake structure, and new control gate. <br />Also evaluated past performance monitoring data to assess embankment performance <br />and dam safety. <br /> <br />Gould ReseIVoir (Onion VaHey Dam). Fruitland Mesa Water Users. Crawford. Colorado <br /> <br />Evaluated performance of existing embankment and feasibility of repairs to control <br />cavitation and compression damage to cast iron outlet conduit. <br /> <br />Alsbury Dam. West Divide Water ConselVancy District. Mesa County. Colorado <br /> <br />De'signed 2S-foot high earth embankment to store irrigation water. Design includes drop <br />inlet spillway and RCP outlet conduit. <br /> <br />Ash Disposal Impoundment. Black Hills Power and Light. Osage. Wyoming <br /> <br />Completed geotechnical field exploration and embankment design studies for a 400,000 <br />ton wet ash disposal impoundment. <br /> <br />Fort Cobb Dam. U.S. Bureau of Reclamation. Caddo County. Oklahoma <br /> <br />Analysis report of existing lOo-foot high earth dam for the USBR's SEED (Safety <br />Evaluation of Existing Dams) program, covering seismotectonic, earthquake behavior, <br />hydrologic/hydraulic, and geotechnical assessments. <br /> <br />Arbuckle Dam. U.S. Bureau of Reclamation. Murray County. Oklahoma <br /> <br />Analysis report on existing ISO-foot high earth dam for the USBR's SEED program <br />covering seismotectonic, earthquake behavior, hydrologic/hydraulic, and geotechnical <br />assessments. <br /> <br />OI3USR.OOllDEN 11-14-91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.