Laserfiche WebLink
<br />I <br />I <br />. <br />t <br />I <br />I <br />I <br />I <br />..... <br /> <br /> <br />I <br />'I <br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,. <br />I <br /> <br />. <br /> <br />. <br /> <br />Woodward.Clyde <br />Consultants <br /> <br />JAMES M. JOHNSON <br /> <br />embankment dam engineering <br />geotechnical engineering <br />tunnel relining <br />mine and industrial waste disposal <br /> <br />EDUCATION <br /> <br />Cornell University, B.S., Civil Engineering, 1976 <br />Purdue University, M.S., Civil Engineering (Geotechnical), 1979 <br /> <br />REGISTRATION <br /> <br />Registered Professional Engineering in Colorado, Oregon, Idaho, Wyoming, Montana, <br />New Mexico, South Dakota, Maine, Florida, Arizona, and Nevada <br /> <br />PROFESSIONAL HISTORY <br /> <br />Woodward-Clyde Consultants, Senior Project Engineer, 1991 to date <br />Steffen Robertson and Kirsten (U.S.), Inc., DivisionHead Geotechnics, 1986-1991 <br />Canonie Engineers, Project Geotechnical Engineer, 1985-1986 <br />Fox Consultants, Inc., Project Geotechnical Engineer, 1985-1986 <br />Klohn Leonoff Ltd., Staff Geotechnical Engineer, 1979-1983 <br />Purdue University, Research Assistant, 1976-1979 <br /> <br />REPRESENTATIVE EXPERIENCE <br /> <br />Mr. Johnson has more than 12 years of experience in the field of geotechnical <br />engineering specializing in the areas of embankment dam engineering and mine waste <br />disposal. His extensive background in natural resource-related technical issues is <br />complemented by project management experience on water resources, mining, and <br />general geotechnical projects. Specific project experience includes: <br /> <br />Gurley Reservoir Dam. Farmers Water Development Company. Norwood. Colorado <br /> <br />Supervised all field and design work for repairs on 75-foot high earth embankment. <br />Program evaluated causative mechanisms for sinkholes in the embankment and <br />foundation and requirements for refurbishing and upgrading outlet works. Design <br />included triple-line foundation grout curtain, relined outlet tunnel, and new intake <br />structure and gate. <br /> <br />Plateau Creek Pipeline/Tunnel. Ute Water Conservan<;y District. Mesa County. <br />Colorado <br /> <br />Completed study to compare technical and economic feasibility of tunnel versus river <br />crossing alternatives for the pipeline. <br /> <br />01311SR.OOIIDEN 11-14-91 <br />