Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br /> <br />. <br /> <br />. <br /> <br />Woodward.clyde <br />Consultants <br /> <br />JAMES M. JOHNSON <br /> <br />page 3 <br /> <br />Pablo Dam and Bonneau Dam. U.S. Bureau of Reclamation. Montana <br /> <br />Technical review of analysis reports on existing 43 and 67-foot high earth dams for the <br />Bureau's SEED program. <br /> <br />Crab Orchard Dam and Little Grassy Dam. U.S. Bureau of Reclamation. Williamson <br />County. Illinois <br /> <br />Report preparation and project management for field investigation program and report <br />for the USBR SEED program including undisturbed sampling, penetration tests, in-situ <br />permeability tests, bedrock coring, and installation of standpipe piezometers and <br />geophysical casings. <br /> <br />Williams Fork Reservoir West Dike. Denver Water Department. Grand County. <br />Colorado <br /> <br />Technical review of geotechnical studies report including evaluations of foundation <br />piping and liquefaction susceptibility. <br /> <br />Harlequin Dam. Kirkham. Michael and Associates. Englewood. Colorado <br /> <br />Inspection of reconstruction of 24-foot high dam following piping failure, including <br />removal of buried CMP culvert outlet w,orks and replacement with concrete encased <br />CMP and seepage collars. . <br /> <br />Standing Rock Dam. U.S. Bureau of Reclamation. Carson County. South Dakota <br /> <br />Analysis report on existing 30-foot high earth dam for the USBR, SEED program <br />covering seismotectonic, earthquake behavior, hydrologic/hydraulic, and geotechnical <br />assessments. <br /> <br />Ponca Dam and Crow Creek Dam. U.S. Bureau of Reclamation. South Dakota <br /> <br />Site inspection and evaluation of embankment and foundation soils of existing 35 and <br />55-foot high earth dam for analysis report of USBR's SEED program. <br /> <br />Orchard Falls Dam. Greenwood Metropolitan District. Englewood. Colorado <br /> <br />Geotechnical inspection and safety evaluation of existing 20-foot high dam, including <br />drilling, sampling, and piezometer installation in dam, outlet works inspection, pond liner <br />inspection, and downstream hazard review. <br /> <br />0131IlR,OOllDEN 11.14-91 <br />