My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00012
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:20 AM
Creation date
10/5/2006 11:29:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153542
Contractor Name
Fruitland Irrigation Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO WATER CONSERVATION BOARD <br />FEBRUARY 21, 1989 <br /> <br />We are willing to proceed as quickly as possible by retaining <br />another engineering firm and continuing with design of the <br />p~oject. Our ability to continue depends upon cweB being agree- <br />able to amending the Contract for performing the feasibility <br />study. The amendment must be to increase the cost of the <br />feasibility work to $19,600 per our discussion on July 20. 1988. <br /> <br />In addition to increasing the cost of the feasibility report con- <br />tract. we would like to remind eWCB that. although the scope of <br />the project has not changed. we do plan to amend the proposed <br />repair. This amendment will be to change the location of the <br />control valve. At this time, we plan to abandon the concrete <br />tower. A new valve will be installed in the existing conduit at <br />a location approximately 420 feet from the outlet end. This <br />location will permit operation of the valve from the shore. <br />eliminate the tower and eliminate a walkway to the tower. There <br />is no change in the proposal for repairing the pipe. The State <br />Engineer. Montrose office, has been advised. and has verbally ap- <br />proved the change. <br /> <br />Please advise us as to the status of the contract between CWCS <br />and Fruitland. Is that contract now being prepared? If not. <br />what specifics are required for us to expedite completion of the <br />contract? You should be aware that we will have to revise the <br />estimated cost of the project due to the time span since prepara- <br />tion of former estimates and probable increase in material costs. <br /> <br />Your prompt attention to this matter will be appreciated. <br /> <br />1%-~~/~L <br />Norber~~ck~~~' <br />President <br />D:HD Gould <br />Wa1ker.221 <br />cc: ewes, Grand Junction <br />Margie Masson <br />UTE Engineering <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.