Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />~, <br /> <br />I _ " ~~ ~ =-CE:NVl ~(Y1&1Sl <br />~AL. >=-t2-",,-no~ ~~ <br />PN \(0S1l2E....<V\ ;::-(.<::><.0 .:5 a.;><\(Vl6D. <br /> <br />11\iZo<...l0l-\ u..)l-hGI-l <br /> <br />No. 87CW272 <br />Colorado Water Cons. Board <br /> <br />~" For the Upper Segment, the description of upstream <br />and downstream points of minimum stream flow reach claimed: The <br />upstream point is the confl)X~nce with North Beaver Brook in the <br />NW/4 NE/4 S14 T4S R72W 6PM. The downstream point is the con- <br />fluence with Soda Creek in the SE/4 NW/4 S8 T4S R71W 6PM. For <br />the Lower Segment, description of upstream and downstream points <br />of minimum stream flow reach claimed: The upstream point is the <br />confluence with Soda Creek in the SE/4 NW/4 S8 T4S R71W 6PM. The <br />downstream point is the confluence with Clear Creek in the NE/4 <br />NW/4 S3 T4S R71W 6PM,/ The total distance of the instream flow <br />reach is 6.2 miles. <br /> <br />5. Use of the water is for instream flows to preserve <br />the natural environment to a reasonable degree. <br /> <br />6. The date of initiation of appropriation for both the <br />Upper Segment and the Lower Segment is December 11, 1987. <br /> <br />7. The amount of water claimed is: <br /> <br />A. For the Upper Segment: 0.5 c.f.s. (April 16 - <br />July 31); 0.25 c.f.s. (August 1 - April 15), both ab- <br />solute. <br /> <br />...~.~ <br /> <br />B. For the Lower Segment: 1.5 c.f.s. (April 16 - <br />July 31); 1.0 c.f.s. (August 1 - April 15), both ab- <br />solute. <br /> <br />8. The water was first applied to the above beneficial <br />use December 11, 1987, by action of the Colorado Water Conserva- <br />tion Board under the provisions of ~~ 37-92-102(3) and V S\o.~ drr<W2Jl~) <br />37-92-103(3),(4),(10), C.R.S. (1990). In'SkNm,u..-d. <br /> <br />9. The minimum instream flow appropriations on Beaver <br />Brook described above are subordinate to the District's right to <br />operate the proposed exchange described in the application filed <br />in Case No. 87-CW-303 without regard to the priority dates that <br />may ultimately be decreed in Case Nos. 87-CW-272 and 87-CW-303; <br />subject to paragraph 10 below. <br /> <br />10. At any time during the period April 16 through July <br />31 when flows in the Upper Segment are less than 0.5 c.f.s., or <br />at any time during the period August 1 through April 15 when <br />flows in the upper segment are less than 0.25 c.f.s., the Dis- <br />trict shall . bypass at the District's Beaver Brook Pipeline on <br /> <br />-2- <br />