Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Alternative I - No Action <br />Alternative 2 - Partial Detention <br />Alternative 3 - Full Detention <br /> <br />Description of the Proposed Project <br /> <br />The alternative selected to be the Proposed Project is the Partial Detention Alternative <br />(Alternative 2). Under this alternative, seven small detention ponds would be created by <br />constructing low height dams across seven (7) openings in the eastern hogback. The largest of <br />the seven proposed ponds, Detention Basin No.1, is an existing structure constructed in 1995. <br />During storm events, ponding behind these dams would remove a majority of the sediment load <br />from storm flows and reduce peak flow rates by approximately 50 percent. <br /> <br />Cost Estimate for Proposed Project <br /> <br />Construction Labor: <br />Construction Materials: <br />Construction Equipment: <br />Contingency: <br />Project Management: <br />Engineering/Design: <br />Land Acquisition: <br />Total Estimated Cost for Proposed Project: <br /> <br />Cost Effectiveness of Proposed Project <br /> <br />Useful Life of Proposed Project: <br /> <br />Annual Maintenance <br />Cost of Proposed Project: <br /> <br />Estimated Frequency <br />of 1997 Flood Event: <br /> <br />Estimated 1997 Flood Damages: <br /> <br />Estimated Dollar Amount of <br />Damage to be Prevented Over <br />Life of Project: <br /> <br />Damage Estimate Justification: <br /> <br />Number of People <br />Protected by Proposed Project: <br /> <br />$ 58,669 <br />$ 28,680 <br />$ 88,724 <br />$ 44,018 <br />$ 6,603 <br />$ 37,415 <br />$ 54.810 <br />$319,000 <br /> <br />50 years <br /> <br />$1,700 <br /> <br />2 year <br /> <br />$61,360 <br /> <br />$730,335 <br /> <br />Appendix A <br /> <br />3,250 (approx.) <br /> <br />E-3 <br />