My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10235
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:30 AM
Creation date
10/5/2006 5:01:15 AM
Metadata
Fields
Template:
Floodplain Documents
County
Fremont
Community
Canon City
Stream Name
Arkansas River & Tributaries
Basin
Arkansas
Title
Hazard Mitigation 404 Grand Application for FEMA - Includes 3 Maps
Date
2/1/1998
Prepared For
FEMA
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />:1 <br />I <br />I <br />I <br />I <br />I <br /> <br />Value of Property to be <br />Protected by Proposed Project: <br /> <br />$112,255,000 (approx.) <br /> <br />Benefit/Cost Ratio <br />of Proposed Project: <br /> <br />1.6 <br /> <br />National Flood Insurance Program <br /> <br />Canon City has participated in good standing in the Regular Phase of the NFIP since November <br />3,1982. The community is currently in compliance with all requirements of the NFIP. <br /> <br />Floodplain Information <br /> <br />The FEMA Flood Insurance Rate Map for the project area is currently not printed. <br /> <br />Community Number: <br /> <br />080068 <br /> <br />Flood Zone Designation: <br /> <br />Zone C <br /> <br />Project Work Schedule <br /> <br />The 404 Mitigation Project Work Schedule/Summary Report will be used for quarterly tracking <br />of the proposed project. The starting date of the project will be immediately following FEMA's <br />approval and grant award for this project. Solicitation for an engineering consultant to perform <br />final design would begin immediately. Project completion would be within 1 year of the starting <br />date. <br /> <br />E-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.