My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10104
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:11:56 AM
Creation date
10/5/2006 4:52:41 AM
Metadata
Fields
Template:
Floodplain Documents
County
Alamosa
Community
Alamosa
Stream Name
Rio Grande
Basin
Rio Grande
Title
Riverwood Estates Subdivision Rio Grande Floodway Evaluation
Date
4/3/1987
Prepared For
Alamosa
Prepared By
Muller Engineering Company, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Mr. Alton D. Cook <br />December 19, 1985 <br />Page 2. <br /> <br />Prior to annexation, two homes had been recently constructed, and since that <br />time, four additional homes have been built in this area. As per our standard <br />building permit procedure, all construction in Riverwood Estates is elevated to <br />at least 18 inches above the 100 year flood level. <br /> <br />As FEMA is aware, this possible floodway problem came to light due to the <br />Colorado Water Conservation Board's involvement in assisting the City and County <br />with flood problems this past June. As a result of this flood potential, the <br />City and County have initiated a $4 million flood control project. The basic <br />objective of the project is to rehabilitate or construct new levees which will <br />meet FEMA's freeboard requirements and adequately protect the city and outlying <br />areas from the 100 year flood. This fall we spent $75,000 on channel <br />straightening, sediment removal and vegetation clearance in the river. We have <br />approximately $750,000 presently committed for 1986, with the possibility of <br />additional state funding by this spring for the project. We are working with <br />the Corps of Engineers, and hope to have them financially committed to the <br />project within the next two years. It is our intention to have this project <br />completed by 1990, based on the availability of federal, state, and local funding, <br /> <br />Per your request, I have enclosed a current map of Alamosa, Should you have any <br />further concerns regarding this subject, please contact me. <br /> <br />Sincerely, <br /> <br /> <br />~pr <br /> <br />City Manager <br /> <br /> <br />lmm <br /> <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.