My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10076
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:11:48 AM
Creation date
10/5/2006 4:51:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Clear Creek
Basin
South Platte
Title
Project Impact Application Package - Clear Creek County
Date
3/12/1999
Prepared For
Clear Creek
Prepared By
Office of Emergency Management
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Note that each project area has a plan phase. Each project committee will develop <br />the components of what should go into their respective plan. The task force will <br />combine the project plans and incorporate them into the Hazard Mitigation Section <br />of "Master Plan '99. <br /> <br />Cc. Benefits <br />The comprehensive approach in future preservation of the county is the benefit to hazard <br />overlay in the GIS. All areas combined may cost $900,000, but one catastrophic event in <br />one area could easily surpass $5,000,000. The project expense is one fifth of possible <br />damage costs. <br /> <br />Cd. Costs $107,000 <br />This section is the initial step needed to draw a master plan outline. Because mapping <br />and analysis are the core of proper planning, and out of that, hazard protection procedures <br />are developed, there is a hazard-related cost for mapping. Project Impact seed money in <br />the amount of $2,000 would be used to pay for the hazard-identification portion of mapping <br />procedures. The $10,000 mentioned in the Master Plan section would be used for the <br />hazard analysis task force that would work with the planning department to coordinate all <br />the information the Hazard Mitigation Section of "Master Plan '99". <br /> <br />Ceo Partners <br />1. Clear Creek Mapping Department <br />2. Mineral Impact Grant <br />3. USGS (overlapping projects) <br />4. C-DOT (overlapping projects) <br />5. Project Impact (hazard ID mapping) <br /> <br />$35,000 <br />$70,000 <br /> <br />$2,000 <br /> <br />Cf. Estimated Completion Date <br />Mapping should be completed by May 1999. The hazard analysis will take longer. <br /> <br />3. Emergency Warning System <br /> <br />3A. Sirens <br />The current EWS is limited to one siren in Idaho Springs that is generated by <br />communications center when a fire rescue or fire page is sent. It does not have dual tone <br />capability. <br /> <br />I' <br /> <br />The Georgetown siren has been disconnected from communications, but is still capable <br />of hand operation. Should an emergency event occur in Georgetown, the tire department <br />would have to physically activate the siren on the pole. It does not have dual tone <br />capability. <br /> <br />22 <br /> <br />--~-"._--~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.