My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10027
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:11:33 AM
Creation date
10/5/2006 4:49:10 AM
Metadata
Fields
Template:
Floodplain Documents
County
El Paso
Community
Colorado Springs
Stream Name
Templeton Gap South Overflow
Basin
Arkansas
Title
LOMR - Affected Panel 080060 0164 D - Case No. 94-08-100P
Date
7/22/1994
Prepared For
Colorado Springs
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />\ <br /> <br />shifted approximately 200 feet closer to Wesley Drive. A portion of the <br />flooding contained in the improved channel is now designated Zone AE and the <br />overflow from the channel and the culverts is designated as Zone AO shallow <br />flooding. Because of the shifting of the SFHA, base (lOO-year) flood <br />elevations (BFEs) are shown for areas that were previously not impacted by <br />100-year flooding. All of the Zone AE flooding is contained on community <br />property but the areas of shallow flooding impact property other than that <br />owned by the requester or the community. This occurs in the vicinity of the <br />intersection of Betty Drive and Van Teylingen Drive. <br /> <br />The modifications are shown on <br />0164 B and Profile Panel 267P. <br />report as part of this LOMR. <br />effecti ve FIRM dated September <br />report dated September 30, 1992. <br /> <br />the enclosed annotated copies of FIRM Panel <br />Profile Panel 267P has been added to the FIS <br />Thi s LOMR hereby revi ses thi s panel of the <br />30, 1992, and the Flood Profile in the FIS <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet>* <br /> <br />Modified BFE <br />(feet)* <br /> <br />At confluence with Templeton <br />Gap Floodway <br />Just downstream of Wesley Circle <br />Just upstream of Wesley Circle <br />Just downstream of Van Teylingen Drive <br />Approximately 150 feet upstream of <br />Van Teylingen Drive <br />Approximately 250 feet downstream of <br />Van Teylingen Drive <br /> <br />6,368* <br />None <br />None <br />None <br /> <br />6,368* <br />6,388* <br />6,395* <br />6,397* <br /> <br />6,398* <br /> <br />6,398* <br /> <br />6,382* <br /> <br />1# <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest <br />whole foot <br />#Depth in feet above ground <br /> <br />Public notification of the revised BFEs will be given in the Gazette <br />TeleRra1>h on or about August 11 and August 18, 1994. A copy of this <br />notification is enclosed. Any request for reconsideration must be based on <br />scientific or technical data. In addition, a notice of changes will be <br />published in the Federal ReRister. We encourage you to supplement this <br />notification by preparing an article for publication in your community <br />newspaper. This article should describe the changes that have been made and <br />the assistance your community will give in providing data and interpreting <br />the NFIP maps. Because this LOMR will not be printed and distributed to <br />primary users, such as local insurance agents and mortgage lenders, your <br />community will serve as a repository for the new data. <br /> <br />The revisions are effective as of the date of this letter; however, within <br />90 days of the second publication in the Gazette TeleRra1>h, a citizen may <br />request that the Federal Emergency Management Agency (FEMA) reconsider the <br />determination made by this LOMR. Any request for reconsideration must be <br />based on scientific or technical data. All interested parties are on notice <br />that, until the 90-day period elapses, the determination to modify the BFEs <br />presented in this LOMR may itself be modified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.