<br />providing flood control storage and providing water supply for municipal and industrial
<br />purposes was also studied as possible components of a multiple purpose project.
<br />Major tasks included water rights evaluation, storable flow computation, PMP/PMF
<br />computation and flood routing, study of 37 years' reservoir operation records, as well
<br />as sizing of principal spillway, primary outlet, and all hydraulic structures and the
<br />preparation of conceptual level engineering plans and cost estimates,
<br />
<br />· Floodplain Information Study, Colorado Water Conservation Board, Black Hawk,
<br />Colorado, Project Manager. Completed flood study of North CIE,ar Creek and several
<br />tributaries in the Black Hawk/Central City area,
<br />
<br />. Flood Insurance Studies, Federal Emergency Management A,gency, Town of
<br />Frisco and Summit County, Colorado, Project Manager. Completed hydrologic and
<br />hydraulic studies of 20 miles of selected mountainous stream reaches,
<br />
<br />· Summit County Small Reservoir Feasibility Study, Colorado Water Conservation
<br />Board, Colorado, Project Engineer. ResponSible for a reconnaissance, siting and
<br />screening evaluation of small water supply dam/reservoir sites in the Blue River basin
<br />upstream of Dillon Reservoir, Summit County, Colorado, Screening criteria included
<br />development of a regional PM F relationship, site geometry, geology, water yield, etc,
<br />Purpose of the reservoir/s is for minimum streamflow augmentation for maintenance of
<br />in-stream aquatic life and habitat.
<br />
<br />· Smith Creek Drainage Basin Planning Study, EI Paso County, Colorado. Project
<br />Manager. Prepared a drainage basin master plan for a five square mile drainage
<br />basin near the U,S, Air Force Academy, This largely undeveloped watershed and
<br />unencroached-upon stream was planned to be proactively protected in its current
<br />condition,
<br />
<br />. Stearns Lake Dam/Reservoir, Boulder County, Colorado, Project
<br />manager/engineer. This project was a multiple'year comprehensive rehabilitation of a
<br />20-foot high homogenous earthfill dam, The project began with a detailed dam
<br />inspection, geotechnical drilling, and piezometer installation and lab testing, A safety
<br />evaluation flood analysis and report was accomplished as a part of the preliminary
<br />design, Design and preparation of plans and specifications for new outlet structures,
<br />irrigation delivery features, spillway enlargement, and embankment repair was
<br />completed. Construction occurred simultaneously with reservoir drawdown for
<br />sediment removal. Provided on,site inspection and construction stage engineering, A
<br />refilling plan was developed and implementation was supervised. Dam/reservoir
<br />operations were monitored for several years following completion,
<br />
<br />. Prentice Gulch Rehabilitation, Greenwood Village, Colorado. Project Engineer.
<br />Designed improvements to 2 miles of Prentice Gulch in Greenwood Village, Colorado.
<br />Responsibility included regional hydrologic analysis, gradually varied flow profile
<br />computations and preparation of complete plans and specifications,
<br />
<br />. Flood Control Levees, Shiwassee Flats, Michigan, Project En'9ineer, Designed
<br />local drainage works, sized detention basins, designed bascule gated detention outlet
<br />works and estimated related construction costs as a part of preliminary engineering for
<br />a major flood control project.