<br />providing flood control storage and providing water supply for municipal and industrial <br />purposes was also studied as possible components of a multiple purpose project. <br />Major tasks included water rights evaluation, storable flow computation, PMP/PMF <br />computation and flood routing, study of 37 years' reservoir operation records, as well <br />as sizing of principal spillway, primary outlet, and all hydraulic structures and the <br />preparation of conceptual level engineering plans and cost estimates, <br /> <br />· Floodplain Information Study, Colorado Water Conservation Board, Black Hawk, <br />Colorado, Project Manager. Completed flood study of North CIE,ar Creek and several <br />tributaries in the Black Hawk/Central City area, <br /> <br />. Flood Insurance Studies, Federal Emergency Management A,gency, Town of <br />Frisco and Summit County, Colorado, Project Manager. Completed hydrologic and <br />hydraulic studies of 20 miles of selected mountainous stream reaches, <br /> <br />· Summit County Small Reservoir Feasibility Study, Colorado Water Conservation <br />Board, Colorado, Project Engineer. ResponSible for a reconnaissance, siting and <br />screening evaluation of small water supply dam/reservoir sites in the Blue River basin <br />upstream of Dillon Reservoir, Summit County, Colorado, Screening criteria included <br />development of a regional PM F relationship, site geometry, geology, water yield, etc, <br />Purpose of the reservoir/s is for minimum streamflow augmentation for maintenance of <br />in-stream aquatic life and habitat. <br /> <br />· Smith Creek Drainage Basin Planning Study, EI Paso County, Colorado. Project <br />Manager. Prepared a drainage basin master plan for a five square mile drainage <br />basin near the U,S, Air Force Academy, This largely undeveloped watershed and <br />unencroached-upon stream was planned to be proactively protected in its current <br />condition, <br /> <br />. Stearns Lake Dam/Reservoir, Boulder County, Colorado, Project <br />manager/engineer. This project was a multiple'year comprehensive rehabilitation of a <br />20-foot high homogenous earthfill dam, The project began with a detailed dam <br />inspection, geotechnical drilling, and piezometer installation and lab testing, A safety <br />evaluation flood analysis and report was accomplished as a part of the preliminary <br />design, Design and preparation of plans and specifications for new outlet structures, <br />irrigation delivery features, spillway enlargement, and embankment repair was <br />completed. Construction occurred simultaneously with reservoir drawdown for <br />sediment removal. Provided on,site inspection and construction stage engineering, A <br />refilling plan was developed and implementation was supervised. Dam/reservoir <br />operations were monitored for several years following completion, <br /> <br />. Prentice Gulch Rehabilitation, Greenwood Village, Colorado. Project Engineer. <br />Designed improvements to 2 miles of Prentice Gulch in Greenwood Village, Colorado. <br />Responsibility included regional hydrologic analysis, gradually varied flow profile <br />computations and preparation of complete plans and specifications, <br /> <br />. Flood Control Levees, Shiwassee Flats, Michigan, Project En'9ineer, Designed <br />local drainage works, sized detention basins, designed bascule gated detention outlet <br />works and estimated related construction costs as a part of preliminary engineering for <br />a major flood control project. <br />