Laserfiche WebLink
<br />Jon Radloff, E.I. has specialized knowledge in hydrologic analysis of historic <br />and proposed conditions using the Rational Method, SCS Method, the Green. <br />Ampt Method, and CUHP Method and hydraulic analysis of existing and <br />proposed facilities using HEC-1, HEC'2, HEC,RAS, SWMM, and Flowmaster. <br />His experience includes site master drainage planning and design, floodplain <br />analysis, and the design of channels, levees, and hydraulic structures, <br /> <br />Quality Assurance/Quality Control <br /> <br />Ayres Associates is committed to high professional services through a program <br />of quality assurance (QA) and quality control measures. A fundamental feature of <br />our QA program is the adoption of standard operating practic€>s. QA measures <br />for projects include the preparation of designs, calculation, drawings, details, <br />specifications, and reports by qualified staff; proper supervision; and <br />conscientious documentation and record keeping, The intent of the quality <br />assurance program is to ensure that all data and documents prepared by Ayres <br />Associates staff be reviewed, checked, and QA procedures documented before <br />their release. Quality assurance is fundamental to our ability to provide excellent <br />consultation. We believe that a quality program ultimately reduces the cost of <br />delivery of engineering services through fewer errors, reduced exposure to <br />liability, less delay, and more effective efforts. <br /> <br />Project scheduling to meet your needs as described earlier under the Availability <br />and Time Schedule section is flexible, yet we appreciate the need to conform to a <br />timetable once developed. Ayres Associates project monitorin!J is accomplished <br />through Advantage, a Harper Shuman accounting and reporting system which <br />provides weekly status reports to assist schedule control. Should graphic or more <br />precise schedule tracking be desired we can provide this through a Gant chart or <br />another project managing scheduling tool. Schedule progress will be tracked and <br />reported to CWCB and any mutually agreed upon adjustments made accordingly. <br />