My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09955
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:11:14 AM
Creation date
10/5/2006 4:46:47 AM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Community
Wiley
Basin
Arkansas
Title
Wiley Flood Hazard Feasibilty Study
Date
1/31/1998
Prepared For
Prowers County
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-. <br /> <br />. <br /> <br />. <br /> <br /> <br />1 Obtain survey/mapping information for project area <br /> <br />2 Pro'ect coordination and overall ro'ect mana ement <br />3 Performance of all tasks and report writing to complete chapter I <br />(Problem Descri tion) of the ro'ect re ort <br />4 Performance of all tasks and report writing to complete chapter <br />II Pro osed Solutions) of the ro' ect re ort <br />5 Performance of all tasks and report writing to complete chapter <br />III (Descri tion of Pro osed Pro' ect of the ro' ect re ort <br />6 Performance of all tasks and report writing to complete chapter <br />IV (Cost Estimate) of the ro'ect re ort <br />7 Performance of all tasks and report writing to complete chapter <br />V (Cost Effectiveness) of the ro'ect re ort <br />8 Performance of all tasks and report writing to complete chapter <br />VI (National Flood Insurance Pro ram) of the ro'ect re ort <br />9 Performance of all tasks and report writing to complete chapter <br />VII Environmental Information of the ro' ect re ort <br />10 Performance of all tasks and report writing to complete chapter <br />VIII ork Schedule) of the ro' ect re ort <br />11 Performance of all tasks and report writing to complete chapter <br />IX (Authorization) of the ro'ect re ort <br />12 Compilation of all text, maps, figures/drawings, and executive <br />summ for fmal re ort. Editin and ublication of final re ort. <br />13 Compilation of all materials and publication of the final <br />A ndix (Technical Addendum) of the ro' ect re ort <br />14 Compilation of all materials for the "Summary of Attachments" <br />of the ro' ect <br />15 Any public meetings or necessary communications with <br />residents, local officials, or other interested arties <br /> <br />Independent <br />Survey <br />Subcontractor <br />CWCB <br />CWCB <br /> <br />Contractor <br /> <br />Contractor <br />Contractor <br /> <br />CWCB <br /> <br />CWCB <br />Local Officials <br />Contractor <br /> <br />CWCB <br /> <br />CWCB <br /> <br />Contractor <br /> <br />Contractor <br /> <br />Contractor <br /> <br />CWCB <br />Local Officials <br /> <br />Specific portions of tasks 4, 5, and 6 for the Contractor to complete are outlined below. All work <br />shall meet or exceed FEMA's requirements for HMGP application. Application information will <br />be provided by the CWCB to the Contractor. <br /> <br />Task 4 - Proposed (Alternative) Solutions: <br />The Contractor shall formulate at least 3 alternative plans to address flooding problems related to <br />the Wiley Drainage Ditch. The upstream study limit of the study reach will be at Highway 287 <br />located in Section 5, and the downstream study limit will be just downstream of the abandoned <br />railroad bridge located in Section 8. The total reach length is approximately 7,000 feet. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.