My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09930
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:11:09 AM
Creation date
10/5/2006 4:45:15 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Columbine Valley
Stream Name
Dutch Creek
Basin
South Platte
Title
Pre-Project Information
Date
7/24/1996
Prepared For
Arapahoe County
Prepared By
Consultants
Floodplain - Doc Type
Community File
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. On Section 0300. Bid Form and Section 01150. Measurement and Payment re- <br />number Add Alternate Bid Items as follows: <br /> <br />Item 1 becomes Item 37, Item 2 becomes Item 38, Item 3 becomes <br />Item 39 and so on through Item 21 which becomes Item 58. <br /> <br />3. Change, Section 01150. Measurement and Payment. Item 14, to read: <br /> <br />14. Stone Veneer (Golf Course Cart Crossinl1 Structures): <br /> <br />4. Replace, Section 01150. Measurement and Payment, Item 17, Install 2-inch PE <br />Irrigation Pipe with the following: <br /> <br />17. Install 2-inch PVc. Schedule 40. Ini~ation Pine: This work includes <br />excavation, pipeline materials (pipe, bends, fittings, etc.), thrustblocks, <br />sleeves under pavement, pipeline bedding, backf1l1, compaction, testing of <br />pipeline, and all related materials, equipment and labor for a complete <br />installation. Measurement will be the number of linear feet of irrigation <br />pipe that is installed and approved by the Project Manager. It shall be paid <br />for at the Contract Unit Price. <br /> <br />5. Add, Section 01150. Measurement and Payment, Item 19, Add the following: <br /> <br />19. All design drawings shall be submitted to the golf course superintendent <br />and the Project Manager for approval prior to commencement of this <br />work. <br /> <br />6. Change, Section 01150. Measurement and Pavment, Item 20 and Section 02496. <br />Inil1ation Svstem, Item 2-3. Delete references to Toro 630 Series Sprinkler Heads <br />and replace with Toro 730 Series Sprinkler Heads. <br /> <br />7. Change, Section 01150. Measurement and Pavment, Item 21 and Section 02496. <br />Irriiation Svstem. Delete references to 2-inch Gate Valve and Box and replace <br />with 2-inch Ball Valve and Box. <br /> <br />8. Change, Section 01150. Measurement and Pavment. Item 36, Golf Cart Crossing <br />Structures. Delete all references to wingwalls. Note: Wingwalls to be paid for <br />under base bid item II-Dry Stacked Rock Wall at Tee Boxes and Fairway. <br /> <br />9. Add to Section 0300. Bid Form and Section 01150. Measurement and Payment, <br />Item 50, Type 'M' Riprap: <br /> <br />Type 'M' Ripr;w: This work includes rock materials, fllter fabric, <br />excavation, backfill, placement of all materials and other appurtenant <br />work. Payment for filter fabric to be included in the unit price of riprap. <br />The unit of measurement for payment of riprap will be the cubic yard. <br />Measurement will be the number of cubic yards placed in accordance with <br /> <br />ADDENDUM NO.2 - July 24, 1996 <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.