Laserfiche WebLink
<br />the Plans and Specifications and as approved by the Project Manager. <br />Riprap volumes in excess of design volumes will not be paid for unless <br />authorized by the Project Manager. Quantities measured by the Project <br />Manager will be paid for at the Contract Unit Price. <br /> <br />10. Revision, Section 02496. Irriiation System, Page 2, Item 2-1: Pipe and Pipe <br />Fittings: <br /> <br />Change Circuit Pipe from 80 pound NSF polyethylene in <br />conformance with ASTM D2239 designated as PE 2306 <br />or PE 3408 to Schedule 40 PVC. <br /> <br />ADDENDUM NO.2 - July 24, 1996 <br />Page 6 <br />