Laserfiche WebLink
<br />12. The contract is to be completed within 175 days from the Notice to Proceed. <br />Substantial completion is to occur within 145 days from the Notice to Proceed. <br />Substantial completion does not include irrigation system, however, planting, <br />irrigation system improvements and sod must be complete prior to May 15, 1997. <br /> <br />If the Add Alternate for the box culvert at Fairway Lane is awarded, the start date <br />for the box culvert will be approximately October I, 1996. If the Contractor <br />desires, he may mobilize and perform work within the CWCB right-of-way after <br />September I, 1996 as long as work within golf course does not start until October <br />I, 1996. <br /> <br />13. Access to project will be limited to two locations. One will be at the south side of <br />Dutch Creek and Fairway Lane. The other will be from the end of Driver Lane on <br />the existing roadway that runs in front of the old maintenance building and along <br />the South Platte River. <br /> <br />14. Stone used in the project will need to match in both color and texture to the <br />existing rock wall that is in place around the Number 10 tee box directly across <br />from the Clubhouse. This stone was supplied by Western Mobile. <br /> <br />15. The Fairway Lane detour is to be in place for the duration of the project and must <br />be useable by school buses. The configuration of the detour does not have to <br />match that shown on the drawings although a minimum inside radius of 26 feet is <br />necessary and a total driving width of 26 feet is to be provided. Prior to <br />construction of the detour, the detour configuration must be approved by the <br />Engineer. <br /> <br />16. The Contractor will not be held liable for the cost of repair to streets within the <br />Town of Columbine Valley as a result of an insufficient asphalt depth on the <br />existing roadways, providing that the Contractor's trucks do not exceed legal load <br />limitations. If existing roads are damaged and the Contractor's trucks operated <br />within the legal load limitations, the Contractor may be asked to repair road <br />damage at an agreed upon cost. Damage to existing curbs. walks, concrete pans <br />and other improvements will be replaced by the Contractor at no cost to the owner <br />regardless of truck loads. <br /> <br />17. Construction staking will consist of setting of a hub and guard stake on both sides <br />of the channel at lOO-foot intervals. Stakes will reference an offset and elevation <br />to top of bank and toe of slope. The top of the low flow boulder channel will also <br />be referenced on the golf course side (north side) of the channel only. All four <br />comers of structures will be staked along with wingwalls. Rock walls will be <br />staked at 50 foot intervals and at the end of each wall. <br /> <br />18. Construction staging is to occur at the confluence area of Dutch Creek and the <br />South Platte. <br /> <br />19. Excavation material can be disposed of on Lot I, Block I of Columbine Valley <br />provided the following conditions are met. <br /> <br />ADDENDUM NO.2 - July 24, 1996 <br />Page 3 <br />