Laserfiche WebLink
<br />Bill Meiers <br /> <br />Town of Columbine Valley <br /> <br />795-1434 <br /> <br />795-7325 <br /> <br />The bid date is AUiust 2. 1996. 2:00 PM MDT. <br /> <br />All other terms and conditions of the CONTRACT DOCUMENTS shall remain <br />unchanged. All bidders must acknowledge receipt of this ADDENDA in the space <br />provided in the BID form. Failure to acknowledge receipt of an ADDENDA may be <br />cause for rejection of the BID. <br /> <br />MEETING MINUTES: <br /> <br />1. Construction staking, materials testing and inspection will be provided on the <br />Project by Love & Associates, Inc. <br /> <br />2. Reference was made to Special Condition No. 19, "Golf Course Play". The <br />Contractor is to provide crossings suitable for golfers and golf carts to cross Dutch <br />Creek for the duration of the Project, with the exception of the months of <br />December and January. <br /> <br />3. Reference was made to Special Condition No. 20, ''Trees to be removed". The <br />golf course anticipates relocating seventeen of the trees which are called out on <br />the project drawings as being removed. These trees will be flagged with yellow <br />ribbon. <br /> <br />4. Work hours will be between the hours of 7:00 AM and 5:00 PM. Weekend work <br />may be allowed but must be requested in writing and approved prior to <br />scheduling. <br /> <br />5. Scrapers and track will not be allowed on any streets within or adjacent to the <br />Project area. <br /> <br />6. Streets must be kept free of all debris, mud. etc. The Contractor must provide <br />cleaning of the streets on a daily basis, if required. It is not anticipated that <br />sweeping on a daily basis will be required. <br /> <br />7. Construction progress meetings will be held on a weekly basis at the site. <br /> <br />8. Contractor's are to use the Bid Form provided in this Addendum No.2. <br /> <br />9. A construction schedule is required at the beginning of the Project and must be <br />updated on an as needed basis. <br /> <br />10. Love & Associates will be videotaping the existing project conditions to insure <br />that when the project is completed it will, at a maximum, reflect pre-construction <br />conditions. <br /> <br />11. All Utility Coordination will need to be provided by the Contractor. <br /> <br />ADDENDUM NO.2 - July 24, 1996 <br />Page 2 <br />