My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09801
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:36 AM
Creation date
10/5/2006 4:39:31 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Greenwood Village
Stream Name
Goldsmith Gulch
Basin
South Platte
Title
Contract Documents and Specifications for Goldsmith Gulch and Tributary Channel Improvements
Date
6/1/1987
Prepared For
Goldsmith Metro District
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Item <br /> <br />40l. <br />402. <br />403. <br />404. <br />405. <br />406. <br />407. <br />408. <br />409. <br />410. <br />411. <br />412. <br />413. <br />414. <br />415. <br />416. <br />417. <br />418. <br />419. <br />420. <br />421. <br /> <br />422. <br />423. <br />424. <br />425. <br />426. <br />427. <br />428. <br />429. <br />430. <br /> <br />TABLE OF CONTENTS <br /> <br />For <br /> <br />SPECIAL CONDITIONS <br /> <br />Title <br /> <br />Gene ra 1 <br />Technical Specifications <br />Description of Hork <br />Drawings <br />Acquisition of Land, Rights-of-way and Easements <br />Construction Staking <br />Inspection <br />Electric Power, Water and Telephone <br />Existing Utilities <br />Materials Furnished by the Owner <br />State and Local Laws <br />Protection of Public and Private Property <br />Fees and Permits <br />Waste Ma terial s <br />Interpretation of Estimated Quantities <br />Operations with Others <br />Construction Limits <br />Field Office Facilities <br />Sanitary Facilities <br />Excess Excavation <br />Control of Construction Work by the <br />Contractor and Engineer <br />Soil Investigation <br />Dust Control <br />Final Acceptance and Final Payment <br />Liquidated Damages <br />Tra ffi c Con tro 1 <br />Preservation of Permanent Land Survey ContTol Makers <br />Qual i fications of Landscape Contractor <br />Noise Control <br />Regulation of Kind and Classes of Traffic and <br />Establishing Truck Routes <br /> <br />!:M.~ <br /> <br />SC-l <br />SC-l <br />SC-l <br />SC-l <br />SC-l <br />SC-l <br />SC-2 <br />SC-2 <br />SC-2 <br />SC-2 <br />SC-2 <br />SC-3 <br />SC-3 <br /> <br />SC-3 <br /> <br />SC-3 <br />SC-3 <br />SC-4 <br />SC-4 <br />SC-4 <br />SC-S <br /> <br />SC-5 <br /> <br />SC-s <br /> <br />SC-s <br /> <br />SC-s <br /> <br />SC-6 <br />SC-6 <br />SC-6 <br />SC-7 <br />SC-7 <br /> <br />SC-i' <br />
The URL can be used to link to this page
Your browser does not support the video tag.