My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09801
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD09801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:10:36 AM
Creation date
10/5/2006 4:39:31 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Greenwood Village
Stream Name
Goldsmith Gulch
Basin
South Platte
Title
Contract Documents and Specifications for Goldsmith Gulch and Tributary Channel Improvements
Date
6/1/1987
Prepared For
Goldsmith Metro District
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />301. g <br /> <br />301.10 <br /> <br />301 .11 <br /> <br />301.12 <br /> <br />301.13 <br /> <br />301 .14 <br /> <br />301.15 <br /> <br />301.16 <br /> <br />301.17 <br /> <br />Contract Documents <br /> <br />The Contract Documents shall consist of the following: Bid Form, Bid <br />Bond, Performance Bond, Labor and Material Payment Bond, Certificate of <br />Insurance, Notice of Award, NoticE' to Proceed, an Addenda issued during <br />the bidding proceSS, the Owner-Contractor Agreement, all wr-itten Change <br />Orders, all drawings and specifications pertaining to the Project. <br /> <br />Contract Price <br /> <br />The total amount stated in the Owner-Contractor Agreement or as altered <br />by subsequent written Change Orders to be paid to the Contractor for the <br />performance of his obI igations under the Contract. <br /> <br />Con tract Time <br /> <br />The number of calendar days stated -in paragraph 201.7 of the Owner- <br />Contractor Agreement, in which the Project is to be Finally Completed. <br /> <br />Contractor <br /> <br />That person identified in paragraph 201.1 of the Owner-Contractor <br />Agreement as being responsible for completing the Project. See Section <br />302.2. <br /> <br />Engineer <br />That person named as Engineer by Owner, being Greenhorne & O'Mara, Inc. <br /> <br />Final Completion <br /> <br />The time at which, on inspection by the Engineer, the Engineer finds the <br />Work acceptable under the Contract Documents and the contract fully <br />performed. <br /> <br />Notice of Award <br /> <br />Written notice sent by the Owner informing the recipient that he is the <br />person selected to act as Contractor for the performance of Work on the <br />Project. <br /> <br />Notice to Proceed <br /> <br />The Owner's notification to the Contractor stating the date on which the <br />Contract Time is to begin to run and the Contract Time. <br /> <br />Owne r <br /> <br />That party identified as such in pal'agrilph 201.1 of the Owner-Contractor <br />Agreement. See Section 302.1. <br /> <br />GC - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.