Laserfiche WebLink
<br />30 <br /> <br />CONSULTING ENGINEERING <br /> <br />14 <br /> <br />1\ 11111 I I I II II If I "" <br /> Net construction % from <br /> cost Curve A.1974 <br /> $100,000 11.63 <br /> 200,000 10.25 <br /> 500,000 8.52 <br /> 1,000,000 7.53 <br />, 5,000,000 6.42 <br />1\ 10,000,000 6.03 <br /> 50.000,000 5.70 <br /> \ 100,000,000 5.64 <br /> ~ <br /> 1\ <br />1m I <br /> , <br />Jill "\. 1m <br /> !'\, <br /> ....... ...... <br /> i <br /> <br />13 <br /> <br />12 <br /> <br />11 <br /> <br /> 10 <br />~ <br />." <br />c' <br />E 9 <br />m <br />. <br />c <br />~ <br />c. <br />E <br />0 <br />u <br />c <br />m 8 <br />'5 <br />~ <br />'" <br /> 1 <br /> <br />6 <br /> <br />5 <br /> <br />4 <br /> <br />0.01 <br /> <br />0.05 0.1 0.5' 1 5 ' 10 <br />Net construction cost, in millions df dollars <br /> <br />50 100 <br /> <br />FIG.!. - CURVE A, MEDIAN COMPENSA nON FOR BASIC SERVICES EXPRESSED <br />AS A PERCENT AGE OF CONSTRUCTION COST FOR PROJECTS OF <br />ABOVE-AVERAGE COMPLEXITY (1914) <br />