Laserfiche WebLink
<br />CONSULTING ENGINEERING <br /> <br />31 <br /> <br />7 <br /> <br /> . <br /> "" iT."11111 , I II <br /> Net construction % from <br /> cost Curve 8-1974 <br /> $100.000 9.01 <br /> 200.000 8.11 <br /> 500,000 7.00 <br /> 1 ,000,000 6.22 <br /> 5,000,000 5.32 <br /> \ 10,000,000 4.97 <br /> \ 50,000,000 4.68 <br /> 100,000,000 4.61 <br /> WlJ <br /> \ <br /> \ <br />, \ , <br /> \. <br />6 '" <br /> r--. <br /> IIII <br />5 - ... <br />4 I <br /> <br />0.b5 0.1 0.5 1 5 10 <br />Net construction cost, in millions of dollars <br /> <br />50 100 <br /> <br />14 <br /> <br />13 <br /> <br />12 <br /> <br />11 <br /> <br />10 <br /> <br />~ <br />.S <br />C <br />.9 <br />~ 9 <br />c <br />~ <br /><> <br />E <br />o <br />u <br />c <br />:6 8 <br />~ <br />" <br /> <br />0.01 <br /> <br />FIG. 2. - CURVE B, MEDIAN COMPENSATION FOR BASIC SERVICES EXPRESSED <br />AS A PERCENTAGE OF CONSTRUCTION COST FOR PROJECTS OF AVERAGE <br />COMPLEXITY (1974) <br />