Laserfiche WebLink
<br />I <br /> <br />I <br />I"" <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.1 <br /> <br />expected annual benefJ.ts "ould be $60,100. The red dual dUl4ges "ould be <br />$13,400. Appurtenant project features "ould J.nclude an earthen levee <br />appro1C1.I1lately 1.700 feet long, a floodltall 1,000 feet long. and two J.nte- <br />rJ.or draJ.nage structures. <br /> <br />Econom1.c analyses for the project IndJ.cate that constructJ.on costs <br />"ould amount to $500,400. Average annual costs "ould be $48,400, compared <br />to average annual benefJ.ts of $60,100. The resultJ.ng benefJ.t/cost ratJ.o <br />Is 1.2. Current J.nformatJ.on J.ndJ.cates that benefJ.ts frOllJ the project /llSY <br />J.ncrease during the feasJ.bJ.lJ.ty study. EnvJ.ronmental analyses reveal no <br />sJ.gnJ.fJ.cant adverse J.mpacts. <br /> <br />The CJ.ty of l1alta. actJ.ng as the non-Federal sponsor, has J.ndJ.cated <br />J.ts support for contJ.nued studJ.es and has arranged funds for the cost- <br />shared feasJ.bJ.lJ.ty study. The DJ.strIct EngJ.neer recoaaends that the <br />necessary plannJ.ng and engJ.neerJ.ng for local flood protectJ.on at l1alta <br />proceed to the feasJ.bJ.lJ.ty phase. <br />