Laserfiche WebLink
<br />4) FEE CONSIDERATIONS - A recommendation will be made that is in compliance with <br />the standard fee consideration. <br /> <br />5) RECLAMATION OF THE SITE - A reclamation plan shall be developed and provided <br />to the CWCB for approval prior to the completion of the project. <br /> <br />6) NON-EXCLUSIVE EASEMENT CLAUSE - Language will be stated in the easement <br />that will reserve the CWCB's right to grant additional easements on the same land <br />covered by this easement. <br /> <br />ITEM 7.a.iii (See Exhibit D) <br />THE COLORADO DEPARTMENT OF TRANSPORTATION (CDOT) request - The CDOT <br />request is for the construction of a segment of the new Santa Fe Drive - Prince Street intersection <br />on the ewCB Project ROW. This proposed construction is located upstream and downstream of <br />the existing Prince Street interchange, in the right overbank areas. The preliminary re-alignment <br />design for Santa Fe Drive project will require approximately 1.0 acre of CWCB lands and a <br />number of impacts to the site on existing project features. These features are: <br />. relocation of an in-place statue which was placed by others; <br />~ relocation of a segment of the bike path which is part of the South Suburban Parks and <br />Recreation Di,strict's trails system; <br />. limited access to the outfall works for the City of Littleton's drainage pipe; <br />. reduced Board access for any future O&M activities that may be required for the project; <br />and <br />. loss of 1.0 acre of CWCB lands. <br /> <br />Use for the Requested Area is for the construction of roadway interchange approaches. In <br />addition, it may be necessary for CDOT to secure additional lands for the relocation of existing <br />facilities which are presently within the desired parcel. <br /> <br />Conditions for the Easement - The CDOT shall comply with the following conditions: <br /> <br />1) TIME PERIOD - The REAL ESTATE AGREEMENT shall be for a term of _ years <br />or if fee title a permanent transfer of ownership. <br /> <br />2) PERMITS - The CDOT shall be responsible for securing and monitoring all required <br />federal, state, and local permits pertaining to Colorado waters and streams.. <br /> <br />3) INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and <br />shall have coverage in the amounts established by the Colorado Governmental hmnunity <br />Act (part one of article 10 of title 24, lOa C.R.S., as amended. <br /> <br />4) FEE CONSIDERATIONS - A recommendation will be necessary that is in lieu of the <br />standard fee consideration. <br /> <br />5) RECLAMATION OF THE SITE - A reclamation plan shall be developed and provided <br />3 <br />