My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09241
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:08:31 AM
Creation date
10/5/2006 4:09:39 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
South Platte River Channel Improvement Project - Board Memos
Date
2/26/1998
Prepared For
Arapahoe County
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Conditions for the Easement - The grantee of this easment shall comply with the following <br />conditions: ( <br /> <br />,1) TIME PERIOD - The EASEMENT shall be for a term of 25 years. <br /> <br />2) PERMITS - The GRANTEE shall be responsible for securing and monitoring all required <br />federal, state, and local permits pertaining to Colorado waters and streams. <br /> <br />3) INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and <br />shall have coverage in the amounts established by the Colorado Governmental Immunity <br />Act (part one of article 10 of title 24, lOa C.R.S., as amended.' . <br /> <br />4) FEE CONSIDERATIONS - A recommendation will be made that is in compliance with <br />the standard fee consideration. <br /> <br />5) RECLAMATION OF THE SITE - A reclamation plan shall be developed and provided <br />to the CWCB for approval prior to the completion of the project. <br /> <br />6) SPECIAL PROVISIONS - A section shall be included in the easement regarding the ' <br />ingress and egress requirements forthe granted area. <br /> <br />Item 7. a. ii <br /> <br />Donald J. Saavedra, on behalf of Kiewit Construction Company, Inc. requests an easement for ! <br />the installation of a 12-inch watermain (See Exhibit C). The watermain will be constructed in the <br />left overbank area of the CWCB project ROW. There are a number of CWCB project features <br />within the requested easement area. <br /> <br />Use for the Requested Area is for the construction of a water supply line to service a <br />development proposal. If granted, the easement would in effect block any future development <br />within the CWCB project ROW. <br /> <br />Conditions for the Easement - If the easement is granted, the owner shall comply with the <br />following conditions: <br /> <br />1) TIME PERIOD - The EASEMENT shall be for a term of25 years. <br /> <br />2) PERMITS - The owner shall be responsible for securing and monitoring all required <br />federal, state, and local permits pertaining to Colorado waters and streams. <br /> <br />3) INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and <br />shall have coverage in the amounts established by the Colorado Governmental Immunity <br />Act (part one of article 10 of title 24, lOa C.R.S., as amended. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.