Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Simons, Li and Associates, Inc. <br />Job Number 6143J002 <br />Project Portland Flume Reconstruction <br /> <br />that temporary support will be required for this structure if con- <br />struction activities remain within the new alignment. <br /> <br />Structure No. 4P - (Sta. 12 + 05): Due to the depth of the exist- <br />ing basement footing and the distance from the new construction, <br />it does not appear that temporary support will be required for the <br />main structure. However, some wooden steps at the northeast cor- <br />ner of the house are located immediately adjacent to the flume <br />wall, and probably will require temporary support during construc- <br />tion, <br /> <br />Structure No. 5P - (Sta. 11 + 37): It does not appear that this <br />structure will require temporary support, However, due to the <br />relatively heavy foundation loading of this building, it should be <br />monitored closely during construction, It appears that inclined <br />bracing or pit underpinning would be feasible for this structure. <br /> <br />Structure No. 6P - (Sta, 8 + 94): It appears that the alignment <br />of the flume will be shifted approximately 4 feet north and deep- <br />ened approximately 5 feet at this location, It appears that this <br />structure will require temporary support and possibly some type of <br />permanent underpinning, particularly along the west end, due to <br />the deepening of the flume at this location. Several methods <br />appear to be feasible for this structure. The concrete and stone <br />basement/stem wall will probably require some lateral support. <br /> <br /> <br />Structure No. 7P - (Sta, 8 + 14): It appears that the alignment <br />of the flume will be shifted approximately 4 feet north and deep- <br />ened approximately 4 feet at this location, Due to the shallow <br />stone footing present under this structure, it appears that tem- <br />porary support will be required, It is doubtful that the stone <br />foundation will clear span any reasonable distance, .therefore, <br />some type of carrier beam will probably be required. <br /> <br />-12- <br /> <br />@ <br />