My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09156
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:08:12 AM
Creation date
10/5/2006 4:07:02 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Uncompahgre River
Basin
Gunnison
Title
Portland Flume Reconstruction Ouray
Date
5/18/1984
Prepared For
Ouray
Prepared By
Western Technologies
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Simons, Li and Associates, Inc, <br />Job Number 6l43J002 <br />Project Portland Flume Reconstruction <br /> <br />~ <br /> <br /> <br />Structure No. 8P - (Sta. 7 + 30): No Temporary support should be <br />required for this structure due to its distance from the proposed <br />new flume wall. The concrete slab adjacent to the south end of <br />the building is close enough to the proposed alignment that it may <br />require some support. <br /> <br />Structure No. 9P - (Sta. 2 + 65): No temporary support should be <br />required for this structure due to its distance from the new pro- <br />posed alignment. <br /> <br />Structure No. lOP - (Sta. 1 + 95) and Structure No, lIP - (Sta. 1 <br />+ 50): It appears from the proposed alignment that the new flume <br />will be located from 20 to 15 feet north of the existing alignment <br />at these locations. Based on this information, it does not appear <br />that temporary support will be require for either of these struc- <br />tures due to their distance from the proposed alignment. <br /> <br />End-Product Specificaions: The following items relating to tem- <br />porary support and/or permanent underpinning systems are offered <br />for possible addition to the project documents: <br /> <br />1. It is anticipated that all structures indicated will <br />require some type of foundation support during construc- <br />tion. Some of these structures will reqUire <br />permanent underpinning as determined by the engineer dur- <br />ing construction, <br /> <br />2. The contractor will submit a design for a temporary sup- <br />port and/or permanent underpinning system for each indi- <br />cated structure for review and possible modification by <br />the engineer prior to construction. <br /> <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.