My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09085
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:07:57 AM
Creation date
10/5/2006 4:04:32 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
97
County
Adams
Community
Thornton
Stream Name
Grange Hall Creek
Basin
South Platte
Title
Major Drainageway Planning - Grange Hall Creek, Phase B, Thornton, Adams County
Date
12/1/1977
Designation Date
1/19/1978
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />C. Improvement Costs <br />A detailed cost estimate of the improvements for the selected plans was prepared <br /> <br />D. Plan Implementation <br /> <br />The improvements indicated on the master plan drawings ill each reach of the study <br /> <br />for the master plan drawings. The costs were divided into the following categories: <br /> <br />area are independent of improvements in the other reaches and, therefore, the <br /> <br />channel improvement, street crossing improvements, right-of-way acquisition, utility <br /> <br />relocation, contingency, operations and maintenance, and fiscal and administrative costs. <br /> <br />improvements can be constructed in any reasonable sequence. The need exists for all of <br /> <br />the proposed improvements; howe~er, the need for some is greater than others. <br /> <br />The improvement costs were then used to update the benefit/cost analysis of the Phase A <br />study. A summary of the benefit/cost analysis is presented in the following table: <br /> <br />The following table presents the recommended priority for order of implementation <br /> <br />according to the various reaches used in the study. <br /> <br />NET BENEFITS <br /> <br />BENEFIT/COST ANALYSIS SUMMARY <br />(6 3/8% Interest Rate) <br />(Thousands of Dollars) <br />COST PRESENT WORTH <br />Northqlenn Thornton Adams Northqlenn Thornton Refer to: <br />1036.2 583.4 7.34 976.1 549.6 Table IV-3,1f <br />114.0 64.1 .8 107.4 60.5 Table IV-3,li <br />19.4 26.8 0 18.3 25.2 <br />46.8 27.0 .3 44.1 25.4 <br />47.04 12.55 0.6 686.4 183.1 Table IV-3,1f <br /> (Annual con- <br /> verted to <br /> present worth) <br /> 9.0 1832.3 843.8 <br /> 1046.0 1189.0 1193.0 <br /> 974.0 333.0 113.0 <br /> -965.0 -1499.3 -730.8 <br /> <br />Priority Jurisdiction <br />I. Northglenn <br />2. Thornton <br />3. Thorn ton <br />4. Northglenn <br />5. Northglenn <br />6. Northglenn <br />7. Northglenn <br />8. Thornton <br /> <br />PRIORITY OF SELECTeD IMPROVEMENT IMPLEMENTATION <br />GRANGE HALL CREEK AND TRIBUTARIES <br /> <br />Item Adams <br />Construction I 7.7 <br />Eng. and.zConst. .8 <br />Services <br />Site Acquis. 0 <br />Fiscal ~nd .3 <br />Admin. <br />O&M .04 <br />(Annual) <br /> <br />II <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TOTAL <br />DAMAGES <br />BENEFITS5 <br /> <br />9. <br /> <br />Northglenn <br /> <br />I . Includes 15% contingency. <br />2. 11% of total of construction. <br />3. 4% of total of construction, engineering, and site acquisition. <br />4. Does not include any public costs for improvements in Reach IG. <br />5. Includes intangible benefits. <br /> <br />T otal* <br />Improvements Estimated Cost <br /> <br />Reach 4S -- Storm Sewer Improvements $167,700 <br /> <br />Reach INE - - Street Crossings and <br />Channel Improvements <br /> <br />Reach 2G -- Street Crossings alld <br />Channel Improvements <br /> <br />182,500 <br /> <br />213,200 <br /> <br />Reach 9G -- Street Crossings and <br />Channel Improvements <br /> <br />34,400 <br /> <br />Reach 8G -- Street Crossings and <br />Channel Improvements <br /> <br />176,500 <br /> <br />Reach 7G -- Street Crossings and <br />Channel Improvements <br /> <br />317,100 <br /> <br />Reach 5S -- Street Crossings and <br />Channel Improvements <br /> <br />Reach I SE -- Street Crossings and <br />Improvements to Brewer Reservoir <br />and Dam <br /> <br />51,700 <br /> <br />104,900 <br /> <br />Reach 2NE -- Street Crossings and <br />Channel Improvements <br /> <br />94,100 <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.