Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I' <br />I <br /> <br /> INFLATED CONSTRUCTION COSTS* <br /> (Present Worth -- Thousand of Dollars) <br />Year Adams County Northglenn Thornton <br />1977 8.1 1101.8 635.3 <br />1978 8.7 1189.9 686.1 <br />1979 9.4 1285.1 741.0 <br />1980 10.2 1388.0 800.3 <br />1981 11.0 1499.0 864.3 <br />1982 11.9 1618.9 933.5 <br />*Does not include Fiscal and Admin. Costs and Operation and Maintenance Costs. <br /> <br />CHAPTER V <br />CONCLUSIONS AND RECOMMENDATIONS <br /> <br />As can be seen from the table, significant increases in improvement costs can occur. <br /> <br /> <br />Hawever, the net benefits derived from the improvements should remain approximately <br /> <br /> <br />the same since damage costs (benefits) would also increase at the same inflationary rate. <br /> <br />The purpose of the Major Drainageway Planning Study for Grange Hall Creek basin <br /> <br /> <br />and its main tributaries was to delineate the drainage problems of the basins, evaluate <br /> <br /> <br />several solutions to the problems, determine the best alternative plan by economic, legal, <br /> <br /> <br />and environmental criteria, and prepare preliminary design drawings for the selected <br /> <br /> <br />alternative plan so that flood plain regulations may be administered and planning for <br /> <br /> <br />future development call be accomplished. The results and conclusions of the study are: <br /> <br />A. Selected Alternative <br /> <br /> <br />The recommendations for improvements jn the Phase-A study were reviewed by <br />Adams County, Northglenn, Thornton, and the Urban Drainage and Flood Control District <br />and the accepted plan for each reach was identified. There were several reaches where <br /> <br /> <br />the selected alternative indicated more improvements than were originally recommended <br /> <br /> <br />ill the Phase A study. One notable example is the draillage improvements in Reach 8G on <br /> <br /> <br />Grange Hall Creek hetween Grant Drive and Washington Street. For this reason and due <br /> <br /> <br />to increased costs due to inflation, some of the improvement costs by reach are higher in <br /> <br /> <br />the Phase B study than in the Phase A study. <br /> <br /> <br />B. Master Plan Drawings <br /> <br /> <br />Master plan drawings were prepared on mylar plan and profile sheets at a horizontal <br /> <br /> <br />scale of I" = I 00' and a vertical scale of I" = I 0'. The drawings are presented in the <br /> <br /> <br />appendix of this report at a reduced scale. The plans present the I DO-year flood plain for <br /> <br /> <br />existing and improved channel conditions for the runoff from a totally developed basin <br /> <br /> <br />based on future land use. The drainage facilities required for the selected alternative are <br /> <br /> <br />depicted on the drawings with detai Is of the improvements shown at larger scales. <br /> <br />23 <br />