Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />EDWIN "CHIP" G. PAULSON <br /> <br />Page 3 <br /> <br />Water Resources <br /> <br />Mr. Paulson has been involved with regional water resource investigations involving surface- <br />and ground-water inventories, future demand projections, and water resource modeling. <br />Representative projects include: <br /> <br />. Project engineer for the Colorado Water Development Study, summarizing statewide water <br />supplies and demands through the year 2100 <br />. Project engineer for the Operations and Yield Study for the Colorado Springs water resource <br />system, including MODSIM model of storage-treatment-delivery system and water rights <br />. Evaluation of water supply alternatives for Santa Clarita Valley, California <br /> <br />Water Quality <br /> <br />Mr. Paulson has been responsible for water-quality studies related to stormwater permit <br />compliance and water quality control. Representative projects include: <br /> <br />. Project manager for On-Call Stormwater Monitoring and Research task orders for California <br />Department of Transportation; task orders involved monitoring of highway runoff, sampling <br />of catch basin sediments, design and monitoring of structural best management practices, and <br />monitoring of construction site inlet protection practices. <br />. Project manager for the NPDES municipal stormwater permit for Las Vegas Valley, Nevada <br />(seven years), including supervision of wet and dry weather monitoring <br />. Project engineer for a NPDES industrial stormwater permit for the Pitchess Honor Rancho <br />prison complex in Los Angeles County, California <br />. Project manager for preliminary design of a channel and detention system for urban runoff <br />control at Sweetwater Reservoir, California <br />. Water quality study plan and model review for MIKE-II modeling of two major river basins <br />in Central Thailand <br />. Principal author for non-point source sections of Clark County 208 Water Quality Plan and <br />Las Vegas Valley Wastewater Needs Assessment <br /> <br />Facility Design <br /> <br />Mr. Paulson has been responsible for preliminary and final design of a variety of hydraulic <br />systems. Design computations have utilized HEC-2 and WSPG for hydraulic analyses. <br />Completed projects include: <br /> <br />. Conceptual design of Numana Dam Meandering Fishway Bypass Channel on the Truckee <br />River near Pyramid Lake, Nevada <br />. Project manager for design of Pittman Park Detention Basin on Pittman Wash in Henderson, <br />Nevada <br />. Project manager for design of inflatable dam spillway modifications and 100-yr hydraulic <br />intake structure for Lake Las Vegas <br /> <br /><<D> MONTGOMERY WATSON <br />