Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />EDWIN "CHIP" G. PAULSON <br /> <br />Page 2 <br /> <br />. Project engineer for a stormwater management plan for Glenrose Basin, Spokane County, <br />Washington <br />. Project engineer for a Flood Control Master Plan for Willow Creek, Utah <br />. Project manager for a study of the Austin Creek drainage system in Vallejo, California <br />. Project engineer for a Drainage Master Plan for the Eastern Drainages Area, Salt Lake City, <br />. Utah <br />. Project manager for a Flood Control Master Plan Update ofthe Las Vegas Valley, Nevada <br />. Project engineer for the Las Vegas City-Wide Hydrology Study and Neighborhood Drainage <br />Master Plans <br />. Project manager and engineer for a Stormwater Master Plan and Update for City of Vallejo, <br />California <br />. Project engineer for a Flood Control Master Plan for all of Clark County, Nevada <br />. Project manager for Drainage Master Plans for Barstow, California and Ridgecrest, <br />California <br />. Project engineer for a Drainage Master Plan for Peoria, Arizona <br />. Staff engineer for Drainage Master Plans for Draper, Utah; Jefferson Parish, Louisiana; and <br />Upland, California <br /> <br />Floodplain Management <br /> <br />Mr. Paulson has been involved in all aspects of flood hazard and floodplain studies. These <br />studies have included the use of HEC-l, TR-20 and statistical methods for hydrologic analyses, <br />and HEC-2 for hydraulic calculations and floodplain delineations. He has analyzed unique <br />floodplain conditions including sheet flows, alluvial fans, distributary networks, levee failures <br />and split flows. Representative projects include: <br /> <br />. Project manager for a Hazard Mitigation Grant Program application to FEMA on behalf of <br />the Colorado Water Conservation Board and the City of Canyon City, Colorado <br />. Project manager for a Flood Insurance Study for the Jordan and Provo Rivers in Utah <br />County, Utah <br />. Project engineer for a floodplain delineation study (hydrology and hydraulics) of Skunk <br />Creek in Maricopa County, Arizona <br />. Project manager for a floodplain mapping study of all major flooding sources in Las Vegas <br />Valley, commissioned by the Corps of Engineers <br />. Project manager for a floodway mapping study of three canyons in Los Angeles County <br />. Project engineer for Flood Insurance Studies in Tulare County, California; Clark County, <br />Nevada; and Catahoula Parish, Louisiana <br />. Staff engineer for Flood Insurance Studies in Clackamas County, Oregon and Lincoln <br />County, Nevada <br />. Staff engineer for floodplain mapping studies of Jean Wash, Nevada; Temescal Wash, <br />California; Las Vegas Wash, Nevada; and Alvarado Creek, California <br />. Hydrologic analyses for a flood insurance study in Central Nevada <br />. Hydraulic analyses of floodplain modifications resulting from a bridge improvement on <br />Carbon Canyon Creek, Placentia, California <br /> <br />((II) MONTGOMERY WAT50N <br />