Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Flood Control Master Plan and Local Pre-Disaster Flood Hazard Mitigation Plan' Town of Georgetown, Colorado <br /> <br />UT. The plan consisted of removing Bureau of <br />Reclamation levees, acquiring the stream corridor, <br />and re-establishing a naturally functioning channel <br />and floodplain morphology. Technical work <br />included floodplain hydraulics, stream morphology, <br />channel design, and multiobjective river corridor <br />planning. <br /> <br />Eastside Drainages Storm Drainage Master <br />Plan, Salt Lake City Utilities - Drainage master <br />plan for 25 square mile portion of eastern Salt Lake <br />City urban area. Technical work included hydrologic <br />modeling, problem area inventory, alternatives <br />analysis, and development of a prioritized <br />implementation plan. <br /> <br />Skunk Creek Floodplain Mapping, Flood <br />Control District of Maricopa County - Floodplain <br />hydrology, hydraulic analysis and mapping for Skunk <br /> <br />Creek, AZ. Application of FEMA mapping <br />guidelines. <br /> <br />Willow Creek Flood Control Master Plan, Salt <br />Lake County - Master plan for rapidly developing <br />portion of Salt Lake County, UT. Recommended <br />improvements included channels, levees, detention <br />basins, and storm drains. <br /> <br />Cross Drainage Study, Central Utah Water <br />Conservancy District - Evaluation of operation <br />of canal system in Heber Valley, UT during flood <br />events. Technical work included hydrologic <br />simulation, flood routing through canals, <br />computation of overflows, and conceptual design <br />of improvements including canal upgrades, <br />spillways, and pump stations. <br /> <br />((II) MONTGOMERY WATSON . 4-3 <br />