My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08394
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:26 PM
Creation date
10/5/2006 3:35:36 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Fountain Dam and Reservoir Design Memorandum Number 1: Hydrology, Part 1
Date
2/9/1978
Prepared For
Pueblo
Prepared By
MSM Consultants, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />f <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />I. <br /> <br />I <br />I <br />. <br />I <br /> <br />i. <br /> <br />I <br />. <br /> <br />. <br /> <br />(" <br /> <br />\ <br />, <br />\ <br /> <br />. <br /> <br />S\,AED-P <br />SUBJECT: <br /> <br />(SWAED-P 9 Feb 78) 2d Ind <br />Fountain Dam and Reservoir, Fountain Creek, Colorado, Design <br />Memorandum No. I, Hydrology - Part 1. <br /> <br />DA, Southwestern Division, Corps of Engineers, PO Box 1580 <br />Albuquerque, NM 87102 . 12 April 1978 <br /> <br />TO: Division Engineer, South"estern, ATTN: SI'JDED-X <br /> <br />1. Transmitted are 10 revised copies of plate IS of the subject design <br />memorandum noting that the unit hydrograph data are based on the contrib- <br />uting drainage area for the standard project flood which constitutes the <br />area below elevation 9000 feet. Also inclosed are 10 copies of pages <br />17 and 19 ,lith reviseil paragraphs 44 and 45. <br /> <br />2. The comment contained in paragraph 2, 3d Ind SWDPL-R (SWAED-EP 27 <br />Dee 76), dated 14 Jun 77, subject: Review of "Preliminary Evaluation <br />of ~ater Quality of Proposed Fountain Lake, Colorado," will be addressed <br />in the Phase I report. Phase I studies at this time indicate that a <br />dam on Fountain Creek is not feasible and therefore minimum effort <br />should be expended on water quality studies. <br /> <br />FOR THE DISTRICT ENGINEER: <br /> <br />3 Incl (10 cys) <br />2. Plate 15 <br />3. page 17 <br />4. page 19 <br /> <br />~0.;- '1do-.-~'- />-- <br />f.....,--:~SPER H.QO~1BES, P.E. <br />. Chief, Engineering Division <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.