My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08394
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:26 PM
Creation date
10/5/2006 3:35:36 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Fountain Dam and Reservoir Design Memorandum Number 1: Hydrology, Part 1
Date
2/9/1978
Prepared For
Pueblo
Prepared By
MSM Consultants, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />( <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />I. <br /> <br />. <br /> <br />~ <br />\ <br /> <br />. <br /> <br />SWDED- XW <br />SUBJECT: <br /> <br />(SWAED-P 9 Feb 78) 1st Ind <br />Fountain Dam and Reservoir, Fountain Creek, Colorado <br />Design Memorandum No.1, Hydrology - Part I <br /> <br />DA, Southwestern Division, 'Corps of <br />1200 }fuin Street, Dallas, TX 75202 <br /> <br />Engineers, <br />2 J/oI1R78 <br /> <br />Main Tower Building, <br /> <br />TO: District Engineer, Albuquerque, ATTN: SWAED-P <br /> <br />1. The subject design memorandum is approved, subject to the following <br />c.omment. <br /> <br />2. The District has not complied with the comment contained in para 2, <br />3d Ind SIVDPL-R (SWAED-EP 27 Dec 76), 14 Jun 77, subject: Review of <br />"Preliminary Evaluation of Water Quality of Proposed Fountain Lake, <br />Colorado," prepared by the Environmental Effects Laboratory, US Army <br />Engineer Waterways Experiment Station. The additional water quality in- <br />formation required by para 4b and 4c of ER 1110-2-1402 should be obtained <br />and presented in the design memorandum. <br /> <br />3. It should be noted that the unit hydrograph data on plate 15 are <br />based on the contributing drainage area for the standard project floud. <br />This constitutes the area below elevation 9000 in each sub-basin. <br /> <br />FOR THE DIVISION ENGINEER: <br /> <br />wd inel <br /> <br />([) ~i"A~ <br />~~~. E YHILL, P.E. <br />~ Chief, ~ineering Division <br /> <br />CF: <br />HQDA (DAEN-CWE-B) w/incl <br />(7 cy) & basic ltr <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.