My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08394
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:26 PM
Creation date
10/5/2006 3:35:36 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Fountain Dam and Reservoir Design Memorandum Number 1: Hydrology, Part 1
Date
2/9/1978
Prepared For
Pueblo
Prepared By
MSM Consultants, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />( <br /> <br />I- <br /> <br />. <br /> <br />. <br /> <br />- <br /> <br />- <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br /> <br />. <br /> <br />S\IDED-XW <br />SUBJECT: <br /> <br />(SWAED-P 9 Feb 78) 3d Ind <br />Fountain Dam and Reservoir, Fountain Creek, Colorado <br />Design Memorandum No. I, Hydrology - Part I <br /> <br />DA, Southwestern Division, Corps of Engineers, Main Tower Building, <br />1200 Main Street, Dallas, TX 75202 2 ~ w .,~ <br /> <br />TO: District Engineer, Albuquerque, ATTN: SWAED-P <br /> <br />We concur with the District's position on water quality as stated in <br />para 2 of the 2d Ind, provided the Phase I study establishes that the <br />project is unfeasible for considerations other than unsuitable water. <br /> <br />FOR THE DIVISION ENGINEER: <br /> <br />wd all inc1 <br /> <br />A~P.E. <br /> <br />Chief, Engineering Division <br /> <br />CF: <br />HQDA (DAEN-CWE-B) w/incl 2, 3, 4 <br />(7 cy) & 2d Ind <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.