My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08366
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD08366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:02 AM
Creation date
10/5/2006 3:33:06 AM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Arapahoe
Community
Greenwood Village, Aurora
Stream Name
Cherry Creek
Basin
South Platte
Title
Probable Maximum Precipitation Study for Cherry Creek Reservoir - Contacts and Meetings
Date
4/21/1972
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,,' <br /> <br />STATE OF COLORADO <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department a/Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone, (303) 866,3441 <br />FAX (303)866-4474 Meeting Announcement <br /> <br />Cherry Creek Dam Safety Study - Technical Meeting #4 <br /> <br />Q <br /> <br />Bill Owens <br />Governor <br /> <br />To: <br /> <br />Members and Invited Members of the Working Group <br /> <br />Greg E.Walcher <br />Executive Director <br /> <br />From: <br /> <br />Larry Lang, Project Director, CWCB <br /> <br />Peter H. Evans <br />eweB Director <br /> <br />Subject: <br /> <br />Agenda for Technical Meeting #4 <br /> <br />Parking: <br /> <br />January 5, 2000 from 1:00 pm to 3:00 p.m. <br />Urban Drainage and Flood Control District, conference room <br />2480 W. 26th Avenue, Suite I56B <br />Diamond Hill Office Complex, phone (303) 455-6277 <br />Street parking, or use west lot across from UDFCD office (please place a <br />note in your front windshield indicating that you are at an official meeting at <br />UDFCD, or see the receptionist for a parking tag) <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Logistics: <br /> <br />Date: <br />Location: <br />Address: <br /> <br />Agenda: <br /> <br />. 1. Welcome and Introductions <br /> <br />2, Review draft meeting minutes from the December 13, 1999 meeting, <br /> <br />3, At the conclusion of our December 13, 1999 meeting, it appeared that a joint Corps of Engineers and <br />Colorado Interests technical review was unlikely because of the rigid Corps' study guidelines and PMP <br />procedures, <br /> <br />4, I've had a number of discussions with the Corps of Engineers regarding PMP and PMF study concerns <br />following our December 13th meeting, There still remains the common "want" by the Corps and the <br />Colorado Work Group to resolve the Cherry Creek Dam Safety Issues, jointly, <br /> <br />5, The QUESTION IS: "How do we get there?" <br /> <br />6, Discussion items for the January 5'" meeting: <br /> <br />. One more time, What and Where is the status of the Corp's technical review? <br /> <br />. Is the National Weather Service (NWS) PMP HMR's the right procedure for the Cherry Creek Dam <br />Safety Study? <br /> <br />. The opportunities for the "Working Group" to draft language for the Corp's technical review are? <br /> <br />. How do we get members of the "Working Group" on the Corps' technical review team for "scoping" and <br />"selecting" a study contractor for the performance of the Corp's study? <br /> <br />. How does the "Working Group" receive copy of the NWS' s study review tasks and when? <br /> <br />. How does the "Working Group" receive copy of the Corp's study procedures and philology for PMP and <br />PMF basin studies? <br /> <br />. <br /> <br />7, Opportunity for joint technical analysis, <br />. Benefits and risks <br />. Communication strategy <br />
The URL can be used to link to this page
Your browser does not support the video tag.