Laserfiche WebLink
<br />. 9,) Prepare the schedule and budget for the performance of a technical review and modification <br />of the NWS's July 13, 1995 study or for an independent, site-specific PMP study for the <br />basin, <br /> <br />10,) Propose a procedure to describe the sensitivity of major basin flood events and paleo- <br />flood hydrology; and <br /> <br />11,) Prepare a "Scope of Work" for an independent review that addresses items 1-10 and <br />present it to the Work Group, <br /> <br />12,) Revise the draft "Scope of Work" based on review comments and feedback for the Work <br />Group. <br /> <br />13,) Present the final "Scope of Work" for acceptance by the Work Group, <br /> <br />Relaled Tasks are: <br /> <br />I) Tour the project area <br />2) Coordinate with work group members and project director <br />3) Interview experts knowledgeable in PMP studies within Colorado and the area of interest <br />4) Prepare final reports <br /> <br />. These products shall be completed on or before June 30, 2000 <br /> <br />L:/wctrans/secafprojects/cherry creek/signs scope of work <br /> <br />. <br />