Laserfiche WebLink
<br />.. <br /> <br />. <br /> <br />. Development of scope of work <br />. Funding <br />. Selection and management of contractor(s) <br />. Peer review by technical panel <br />. Corps and National Weather Service acceptance of site,specific analysis, <br />. Need for "Memorandum of Understanding," <br /> <br />8, Decision Items: , <br />. Should the CWCB staff request $5.000 for a three member technical panel to assist the "Working <br />Group" in drafting a "Scope'of-Work" for a joint Federal, State and local interest or a State and local <br />interest technical review study? <br />. What is the preferred study schedule and contractor? <br />. When do we engage in Congressional communications regarding specific study language for this <br />technical review? <br />. Next meeting schedule, location, <br />. Other, <br /> <br />cc: Peter Evans, Director, CWCB <br />Hal Simpson, State Engineer, DWR <br /> <br />1:\wctranS\seca\projects\cherry creek\meeting agenda 1-5-OO.doc <br /> <br />. <br /> <br />. <br />