Laserfiche WebLink
<br />X"7 <br /> <br />d. ConstructIon of channel control structure.s and low flow erosIon <br />protection devices on a pay-as-you-go basis over the next ten <br />years, generally keeping pace wIth the r/lte of urban development. <br /> <br />e. Construct the two short reache.s of channEd improvements where <br />specIfic problems exIst as cal led for by the local entities. <br /> <br />f. I nsure that the State HIghway Depllrtment County Road Works, <br />developers and municIpalities construct new brIdges and culverts <br />In accordance wIth this preliminary design. <br /> <br />45. It Is recommended that the work undertaken b~, done on a pay-as"you.go <br />bas Is and that an urban dra Inage serv'lce charge be assessed to the <br />developers between the Weld County LIne and ~;tandley Lake at $10 <br />per Equivalent Residential Unit. <br />