Laserfiche WebLink
<br />x-6 <br /> <br />37. Energy dlsslpators are required below the Calkins Ditch headgate. (Sheet 15), <br /> <br />38. In addition to the two existing 9-foot diameter culverts, two new <br />10' x 17' box culverts are to be constructed at a substantially <br />higher el<!vation than the existing culverts under Sheridan Boulevard. <br />Special attentIon Is to be given to thO! construction of head walls <br />and entrances for both the existing and the new culverts. (Sheet In. <br /> <br />39. FIve hundred feet of concrete median bal-rler(ln U. S. 36 (Denver- <br />Boulder Turnpike) should be removed and replaced with .3 post and <br />rail type steel barrier to allow for passage of storm water over <br />the Turnpike. (Sheet 19). <br /> <br />49. A benefit cost type analysis was performed during Phase A to deter- <br />mine the Illternative and design frequency to be studied In detali <br />for Phase B. The al ternat Ive chos,en h'IS the lellst annuai cost of all <br />alternatives and frequencies studied. <br /> <br />41. Channel work, bank protection, road embankment materials and bridges <br />that are necessary to meet road overtopping criteria have been In- <br />cluded In the highway fund respons Ibi I ity. ThIs Is especially suit- <br />able for this study since nearly all bridges and roads do not meet <br />the vehicular criteria of their future intended use. <br /> <br />42. In keepln~, with present policies in both Adams County and WestmInster, <br />no cost has been Included for land acquisition. Both entitles re- <br />quire developers to preserve the flood plain and/or turn over the <br />rights of the flood plain property to the re~lpectIve agencies. <br /> <br />43. During large storms It Is expected that: the high velocIties durIng <br />the peak runoff and the sed I mentat Ion t.hat will occur <IS the runoff <br />rate decreases w III comb I ne to cause cons I der,ab 1 e channe I a i terat. Ion. <br />The cost shown for 0 & M and for flood damagE'S applies equally to <br />reestablishing the old channel If des Ir'able or to construct Ion of <br />new low flow erosIon protective devIces for (:nannO!l stabilization. <br /> <br />44. The Implementation of the preliminary des ign should include the <br />following major steps: <br /> <br />a. Designation of the Big Dry Creek Flood PlaIn by the Colorado <br />Water Conservat Ion Board In aCGord,~nce wi th State Statutes and <br />procedures which are wel I defIned and und<!rstood. <br /> <br />b. Adoption by the local governmental entltlO!s Involved of the Flood <br />Plain Regulation of the Urban [lralnage and Flood Control District. <br /> <br />c. Local overlay zoning of the flood plain h~1 thE' City of Westminster <br />and the Counties of Jefferson ''II1d !\dams. This wll I not change <br />basic zonIng of the land. <br />