Laserfiche WebLink
<br />Table 7 <br />Benefit-Cost Analysis <br /> <br />Elm Creek <br />Channel <br />Imorovements <br /> <br />Elm Creek <br />Channel Improve- <br />ments and Bridge <br />Reolacement <br /> <br />First Cost $284,500 $4l8,OOO <br />Interest During <br />Construction 12,450 18,290 <br />Total Investment <br />Cost $296,950 $436,290 <br />Total Annual Cost $ 25,990 $ 38,180 <br />Total Annual <br />Benefits $ 21,800 $ 27,291 <br />Benefic-Cost Ratio 0.84 0.71 <br />Net Benefits $ -4,190 $-10,889 <br /> <br /> Shell <br /> Creek Elm Creek <br /> Levee Diversion <br />$ 98,400 $831,100 <br /> 4,300 36,360 <br />$102,700 $867,460 <br />$ 8,990 $ 75,920 <br />s: ,10,210 $ 47,480 <br /> 1.14 0.63 <br />$ 1,220 $-28,440 <br /> <br />*Interest and amorcizacion for'annual costs based on 100 years at 8.75 <br />percent. <br /> <br />This report covers several types of nonstructural measures that <br /> <br /> <br />could help solve the problems in Platte Center, Because nonstructural <br /> <br />.' <br />measures must be designed for each individual property because of the <br />.. - ' . ~. <br /> <br />variability in structure location, struccure construction, flood <br /> <br /> <br />depth, flood velocity, structure value, and so forth, this section <br /> <br />will provide informacion of sufficient detail so that the community <br /> <br /> <br />and the individual property owner can make an initial assessment of <br /> <br /> <br />the appropriaceness of che various measures and the approximate cost <br /> <br />of the measures. <br /> <br />After comp1ecion of che initial assessment, the <br /> <br />c~mmunity and the propercy owner would need:~o obtain detailed designs <br />and cost estimates for application of each measure as appropriate. <br /> <br />24 <br />