My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07317
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:01 AM
Creation date
10/5/2006 2:52:59 AM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Weld
Community
Erie
Stream Name
Coal Creek
Basin
South Platte
Title
Invitation for Bids Coal Creek Flood Control Project at Erie
Date
8/1/1980
Prepared For
Erie
Prepared By
Water Resource Consultants
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br /> <br />10.09 <br /> <br />10.10 <br /> <br />10.11 <br /> <br />GC-ll <br /> <br />GC-12 <br /> <br />cost incurred by an approved snbstinltion (including engineering costs of redesign) shall be at <br />the CONTRACTOR's expense. The CONTRACTOR shall process requests for material <br />substitutions m a timely manner. Prior approval of substitutions is mandatory before <br />installation. <br /> <br /> <br />MATERIALS APPROVAL. The CONTRACTOR shall submit, in writing, the names and <br />addresses of Ule manufacturers or suppliers of all materials to be used on this project. Such <br />information shall include applicable testing certifications, sizes, types, design specifications, <br />location of source, etc., and shall be submitted to the ENGINEER, between the time of the <br />awarding of the CONTRACT and the time the "Notice to Proceed" is issued, in order that <br />ample time can be allowed for testing and inspection of the various materials to be used. All <br />materials and equipment must be new and approved by the ENGINEER prior to start of <br />construction, <br /> <br />PROCEDURES FOR SUBMITTALS. The CONTRACTOR shall submit SHOP DRAWINGS, <br />requests for material and equipment approvals and/or substitution approvals, etc., in a timely <br />manner so as to allow fourteen (14) calendar days for review, research, testing and inspection <br />if necessary. <br /> <br />Nonnally, a minimum of six (6) full sets of submittal documents for each request will be <br />required to be furnished to the ENGINEER. Upon approval or disapproval by the <br />ENGINEER, distribution will be made as follows: <br /> <br />2 sets returned to CONTRACTOR <br />2 sets furnished to CONSTRUCTION INSPECTOR or RESIDENT <br />ENGINEER (1 set shall be marked "As Constructed, RECORD <br />FILE" and filed with the Construction Record File <br />1 set furnished to the OWNER <br />I set retained by the ENGINEER <br /> <br />Prior to submitting any SHOP DRAWINGS or other required documents for material and <br />equipment approvals and/or substitution approvals to the ENGINEER, the CONTRACTOR <br />shall carefully review such documents to assure that they are complete and adequate in every <br />respect. The CONTRACTOR shall endorse each submittal, regardless of sonrce, and shall <br />certify um he has reviewed, checked and approved the documents and it is his opinion that <br />they are in conformance with the CONTRACT DOCUMENTS. <br /> <br />COSTS. No separate payment will be made for any of the requirements of this General <br />Condition and all costs incurred will be considered to be included in the CONTRACT PRICES <br />bid. <br /> <br />SUGGESTIONS TO CONTRACTOR, Any plan of action, method of work or construction <br />procedure suggested to the CONTRACTOR by the ENGINEER, INSPECTOR, or the OWNER <br />or any of their representatives, whether orally or in writing, if adopted or followed by the <br />CONTRACTOR in whole or in part, shall be at the sole risk and responsibility of the <br />COI\TRACTOR. <br /> <br />CONSTRUCTION SCHEDULE. Unless otherwise directed by the ENGINEER, the <br />CONTRACTOR shall submit to the ENGINEER, prior to commencement of WORK a schedule <br />of all construction operations showing the sequence of WORK and the dates on which each <br />segment of the WORK is expected to be started and completed. Within seven (7) days after <br />the first day of each monUl, the CONTRACTOR shall submit a summary report of the work <br />completed. If an extension of CONTRACT time, is granted by the ENGINEER for any <br />justifiable reason, the CONTRACTOR shall submit a revised construction schedule in <br />accordance with the approved extension. <br /> <br />III -10 <br />(1723 - IO/93) <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.