My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07306
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:24 PM
Creation date
10/5/2006 2:52:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Cache La Poudre River General Investigation Study, Greeley, CO
Date
5/1/2005
Prepared For
Greeley
Prepared By
USACE, Omaha, NE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I Cost Apportionment 40 $ 2,640 <br /> Assume coordination <br /> meeting with PM andlor <br />I Apportion cost to appropriate parties 40 66 $ 2,640 sponsor Post-Phase I <br />Financial Analysis of Sponsor 16 $ 1,056 <br />I Prepare financial analysis 16 66 $ 1,056 Shared task with PM Post-Phase I <br /> Feasibility Report Preparation 160 $ 10,560 <br />I Prepare narrative, tables for draft <br />preliminary report & socioeconomic <br /> appendix 80 66 $5,280 Post-Phase I <br />I Prepare revisions for final prelim. report & <br />appendix 80 66 $5,280 Post-Phase I <br />I Coordination 64 $ 4,224 <br /> Coordinate with H&H on <br /> HEC-FDA input & output <br />I Coordinate with others (ED-H re outputs, data, NED/NER analysis, <br />& results of HEC-FDA) 16 66 $ 1,056 separable costs Phase I <br /> 16 66 $ 1,056 Post-Phase I <br />I Attend in-house meetings 16 66 $ 1,056 Phase I <br /> $ Post-Phase I <br /> 16 66 1,056 <br />I Public Involvement 48 $ 3,168 <br /> Attend meeting with sponsor 16 66 $ 1,056 Post -Phase I <br />I Prepare for and attend public meeting 16 66 $ 1,056 Post-Phase I <br /> Review & address socioeconomic <br />I comments from meeting w/sponsor 16 66 $ 1,056 Post-Phase I <br /> Quality AssurancelQuality Control 76 $ 7,356 <br />I Supervisory review & comments for <br />ONOC report process 60 105 $ 6,300 Post-Phase I <br />Respond to review comments from <br /> internal review 16 66 $ 1,056 Post -Phase I <br />I Independent Technical Review 64 $ 5,472 <br />I ITR outside district 32 105 $ 3,360 Post-Phase I <br /> Respond to review comments from ITR 32 66 $ 2,112 Post-Phase I <br />I Additional: Travel Cost $ 1,380 <br />Travel includes 1 trip - site visit for land <br />I use surveying <br />Air Fare (1 Roundtrip flight Omaha to <br />Denver) 390 Phase I <br /> 26 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.