My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07306
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:24 PM
Creation date
10/5/2006 2:52:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Cache La Poudre River General Investigation Study, Greeley, CO
Date
5/1/2005
Prepared For
Greeley
Prepared By
USACE, Omaha, NE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I Includes developing a new <br /> plan for each alternative, <br /> Levee Set BackslBridge Replacementsl adjusting WSP and <br />I Channellmprovementsl Off Channel structures included in <br />Storagel Relocations floodplain. <br />Compute EAD for each with-project <br /> alternative. 80 66 $ 5,280 Phase I <br />I <br />Compute NED Benefits 188 $ 13,344 <br /> Determine flood benefits for <br />I structureslcontents for each alternative 40 66 $ 2,640 Phase I <br /> Need # of structures <br />Determine NFIP admin cost avoidance removed from 100-yr <br /> benefits of alternative plans 8 66 $ 528 floodplain Phase I <br />I Use CENWO standard <br />Determine benefits of public 11%+5.5%=16.5% if <br /> damagelemergency cost reduction 8 66 $ 528 historic data "na" Phase I <br />I Evaluate possible recreation benefits 60 66 $ 3,960 Post-Phase I <br />I 24 105 $ 2,520 Post -Phase I <br />Benefit-Cost Analysis, net benefits of Cost includes calc. IDC and <br />alternative plans 48 66 $ 3,168 OMRR&R Phase I <br />I Evaluate National Ecosystem <br />Restoration (NER) Plans 160 $ 10,560 <br /> Coordination with environmental team 20 66 $ 1,320 Phase I <br />I 20 66 $ 1,320 Post-Phase I <br /> Setuplinput data of ecosystem rest. <br /> alternatives into IWR-Plan or selected <br /> environmental model 80 66 $ 5,280 Phase I <br /> Screening of preliminary alternative plans 8 66 $ 528 Phase I <br /> Evaluation and comparison of alternative <br /> plans 32 66 $ 2,112 Post-Phase I <br /> May require HQ staff to <br /> Formulate and Evaluate Combined make visit to Omaha to <br /> Flood Damage Reduction & Ecosystem assist in trade-off analysis if <br /> Restoration Plans 290 $ 19,140 combined plan is pursued. <br /> Formulation of preliminary combined <br /> alternative plans 40 66 $ 2,640 Phase I <br /> Screening of preliminary combined <br /> alternative plans 40 66 $ 2,640 Phase I <br /> Analysis of combined alternative plans 110 66 $ 7,260 Post-Phase I <br /> Evaluate & compare of combined <br /> alternative plans 100 66 $ 6,600 Post-Phase I <br /> Cost Allocations 80 $ 5,280 <br /> Allocate costs if multipurpose project 80 66 $ 5,280 Post-Phase I <br /> 25 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.