Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table A-2 Esllmate for the First Phase of the Feasibilitv Stud\ <br />CACHE LA POUDRE AT GREELEY, COLORADO <br />COST ESTIMATE TO DECISION POINT 1 <br /> <br />(May 2005) <br /> <br />Work Item <br /> <br />Cost Estimates <br />($) <br />Corps In-Kind Total <br />$1,688 $0 $1,688 <br /> <br />Cultural Resources Assessment <br /> <br />Environmental Studies <br /> <br />$44,596 $0 <br /> <br />$44,596 <br /> <br />Economic Studies <br /> <br />$42,666 $1,600 <br /> <br />$44,266 <br /> <br />Real Estate Studies <br /> <br />$29,266 $13,820 <br /> <br />$43,Q86 <br /> <br />Hydrologic Studies <br /> <br />$42,090 $2,400 <br /> <br />$44,490 <br /> <br />Flood Plain Management Studies <br /> <br />$12,576 $600 <br /> <br />$13,176 <br /> <br />Hydraulic Studies <br /> <br />$80,380 $8,900 <br /> <br />$89,280 <br /> <br />Geotechnical Studies <br /> <br />$15,020 $2,400 <br /> <br />$17,420 <br /> <br />HTRW Baseline Study <br /> <br />$10,000 $0 <br /> <br />$10,000 <br /> <br />Surveys and Mapping <br /> <br />$12,150 $3,600 <br /> <br />$15,750 <br /> <br />Structural Studies <br /> <br />$0 $0 <br /> <br />$0 <br /> <br />Project Cost Estimates <br /> <br />$9,290 $0 $9,290 <br /> <br /> <br />Constructability Review <br /> <br />$0 $0 $0 <br /> <br />Plan Form & Project Management <br /> <br />$61,350 $13,020 $74,370 <br /> <br />Programs Management <br /> <br />$3,611 $0 $4,074 <br /> <br />Federal Audit <br /> <br />$0 $0 $0 <br /> <br />Value Engineering <br /> <br />$0 $0 $0 <br /> <br />Required Washington Level Review <br /> <br />$10,000 $0 $10,000 <br /> <br />SUBTOTAL <br /> <br />$374,683 $46,340 $421,486 <br /> <br />Contingency (approx 15%) <br /> <br />$56,202 $6,951 $63,223 <br /> <br />PHASE 1 STUDY COST <br /> <br />$430,885 $53,291 $484,709 <br /> <br />7 <br />