Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2.0 Decision Point 1 Cost Estimate <br />Table A,2 outlines the current cost estimate for doing the first phase of the Feasibility <br />Study, This first phase will cover problem identification, conceptual plan formulation <br />and the delineation of solution alternatives. The focus of this portion of the study will be <br />on identifying a flood control and ecosystem restoration project that has solid sponsor <br />support and is in the "Federal Interest". This table also provides the estimated study <br />costs, with and without the 15% contingency. <br /> <br /> <br />6 <br />