|
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />a e or Brea own tructure or the Tota Feasibllty Study,
<br />CACHE LA POUDRE AT GREELEY, COLORADO
<br />DRAFT FEASIBILITY STUDY COST ESTIMATE
<br />(May 2005)
<br />Work Item Cost Estimates
<br /> ($)
<br /> Corps In-Kind Total
<br />Cultural Resources Assessment $6,250 $0 $6,250
<br />Environmental Studies $163,266 $0 $163,266
<br />Economic Studies $104,772 $3,960 $108,732
<br />Real Estate Studies $110,531 $22,880 $133,411
<br />Hydrologic Studies $125,000 $4,300 $129,300
<br />Flood Plain Management Studies $16,902 $600 $17,502
<br />Hydraulic Studies $215,771 $8,900 $224,671
<br />Geotechnical Studies $58,998 $6,000 $64,998
<br />HTRW Baseline Study $10,000 $0 $10,000
<br />Surveys and Mapping $23,340 $9,840 $33,180
<br />Structural Studies $10,000 $0 $10,000
<br />Project Cost Estimates $27,874 $0 $27,874
<br />Constructability Review $4,000 $0 $4,000
<br />Plan Form & Project Management $185,377 $41,412 $226,789
<br />Programs Management $10,921 $11,931
<br />Federal Audit $10,921 $1,920 $11,931
<br />Value Engineering $30,000 $3,120 $33,120
<br />Required Washington Level Review $54,604 $8,400 $59,655
<br />SUBTOTAL $1,168,526 $111,332 $1,276,609
<br />Contingency (approx 15% ) $175,279 $15,365 $191,491
<br />TOTAL STUDY COST $1,343,805 $126,697 $1,468,101
<br />
<br />T bl 2 W k
<br />
<br />kd
<br />
<br />S
<br />
<br />fi
<br />
<br />T
<br />
<br />
<br />12
<br />
|